AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 17 of 38  ELOG logo
Entry  Wed Feb 9 08:01:41 2022, OH, CB, G-HC, Results from no beam overnight 220209_0852_leakage.png220209_0900_leakage_shake.png
08:52 Overnight the DAQ was left running to check if there was any individual radioactivity in the Si.
      This is stored in R7_75
Entry  Thu Jul 13 08:46:44 2023, TD, Replacing wire seal 20230713_135351.jpg20230713_135416.jpg

09.30 CARME chamber status
Entry  Mon Sep 25 16:33:32 2023, TD, Removed tape from heaters TC 1000007072.jpg1000007067.jpg1000007070.jpg

17.33 IE514 pressure 6.4e-11 mbar, ambient temperature +20.8 deg C
Entry  Wed Jan 17 10:31:05 2024, TD, Remote control of CAEN N1419ET from nnrpi1 Capture.PNG

Login to nnrpi1 from carme-gsi using ssh
Entry  Thu Jan 27 14:04:34 2022, OH, JM, Remote access to CARME server 
1. ssh into lxpool network: ssh <user>@lxpool.gsi.de
2. ssh into atppc022.gsi.de: ssh carme@atppc022.gsi.de (This is an rpi access server. Don't run code)
3. ssh into carme server: ssh npg@carme-gsi
Entry  Thu Feb 24 07:25:53 2022, OH (Remote), Recover of system after crash 
08:00 Woke up to message from Carlo explaining the server had crashed.
      Anydesked into the machine.
      Merger was showing just data transfer it was not showing Transfer => Merger
Entry  Mon Jun 16 22:06:00 2025, CB, AR, EW, RUN 90-91 14x
23:00 DAQ restored and data now being written okay. Checks all okay, see screenshots below. Histograms reset. 40 bars in bottle @ 23:45 - should last
30 hours.

12:00 Checks all ok. No problems with aidas or writing to disk.
Entry  Tue Nov 24 12:24:01 2020, JM, RGA scans 20201124_124107.jpg
RGA laptop passcode: tw%11&STA-   

RGA scans set up and plotting data as of 11:44

RGA is set to the multiplier mode (4.44e-8mbar) with an accuracy setting of 8, these are for the most sensitive scans. RGA is set to scan masses
Entry  Thu Jun 13 14:46:17 2024, TD, R66 beam overlap test 

15.45 Start data file G22-201/R66 
      Beam/target overlap test
Entry  Thu May 22 06:41:10 2025, JG, TD, R6 - R11 scrapers test / pulser walk 33x
07.00 

JG found target off (target data stopped c. 02.30 this morning) and beam off (not re-enabled from previous CRYRNG area entry - target related?) JG re-enables
Entry  Mon Jun 10 05:24:49 2024, TD, RSS, DB, R57 16x
06:45 New data file G22-201/R57

      Right arm at 64.60 mm
Entry  Sat Jun 8 14:49:14 2024, TD, R51 - contd 30x

15.40 DSSSD bias & leakage current OK - attachments 1-2
       log shows variations due to ambient temperature changes in CRYRING hall
Entry  Tue Feb 20 13:20:44 2024, OF, AG, JG, ML, R48 status check Screenshot_from_2024-02-20_14-22-05.pngScreenshot_from_2024-02-20_14-22-49.pngScreenshot_from_2024-02-20_14-29-39.pngScreenshot_from_2024-02-20_14-34-55.png
Doing afternoon check. Checked the leakage currents, all ok. Attachment 1

Temperatures ok, attchment 2

System wide check, all correct.
Entry  Wed May 21 14:38:22 2025, JM, TD, R4 and R5 - background 7x
15:30

Waiting for the target to cool down. ETA is 16:30 for cooling to be finished and then we need to try and make target.

While waiting we havve been running a background (R3). I noticed the rates on aida10 had increased (300k) and aida09 were slowlly creeping up
Entry  Wed Sep 16 17:46:36 2020, JM, Pumping of Chamber Photos.zip
A pump cart and leak cart have been connected to the chamber via the top turbo at the back of the chamber. An air line has also been connected to the
valve to open/close it. The pirani gaige has also been replaced by a blank flange, a gauge on the pump cart can measure the pressure in its range. The
turbo fan and controller were set up and pumping was started after lunch. 
Entry  Tue Jul 18 08:16:28 2023, TD, Pumping down. Issues found with one detector. 
09.15 Following overnight pumping of CARME chamber by Leybold turbo
      Pirani 1.00e-3 mbar IE514 2.83e-7 mbar
Entry  Sun Jun 25 10:08:30 2023, JM, TD, Pump-down  Figure_1.png20230625_120640.jpg20230625_120648.jpgpump-down.png
23/06/23

Pumpdown started with the scroll pump 17:15 . The turbo-pump was started 17:55. Gate valve was closed and the turbo turned of at 19:20 due to
no working fan on the turbo. 
Entry  Mon Jul 24 10:40:14 2023, RSS, TD, Pump down continues vacplot.pngvacplot24.png
11.40 Pirani 1.00e-3 mbar IE514 2.23e-08mbar

15.15 7d/24h vacuum plots
Entry  Wed Jul 5 19:27:13 2023, JM, Pump down and leak test pumping_1.pngpumping-zoom.pngsignal-2023-07-05-15-13-30-512.jpg
CARME and the interaction chamber have been pumping for ~26 hours, P=4.15e-7 mbar, attached figures show the current pump down plot in comparison to
the two previous pumpdowns in the last 2 weeks and the pump down with the bare chamber in 2020. The gradient of the pressure reduction appears to be improving
for each pump down, either due to conditioning of the chamber or the reduction in leaks.  
Entry  Tue Feb 15 14:59:37 2022, JM, CB, RJC, Pulser walkthrough 11x
16:00

Check Fee temperatures: all green (see attachment 1)

Check statistics tab: ADC data items (see attachment 2)
ELOG V3.1.3-7933898