AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 18 of 38  ELOG logo
ID Date Author Subjectdown Text Attachments
  500   Thu Feb 8 17:11:50 2024 CB, EHPulser walkthrough
17:30 File G22-88/R8

Pulser walkthrough

EGG
Ortec 448 Pulser

Amplitide 90,000-10,000
@ 10,000 step
Normalise 5.0
Attenuators
 4.png3.png 
  492   Mon Feb 5 12:48:50 2024 CB TDPulser walkthough - Run4
13.41 DAQ start - file G22-88/R4
 Screenshot_from_2024-02-05_14-04-33.pngScreenshot_from_2024-02-05_14-05-16.png 
  555   Tue May 28 15:25:21 2024 TD, JM, CBPulser testsR3 started

Pulser ON. Approx 2 kHZ.

1.8*w waveforms attachments 1+2
 Screenshot_from_2024-05-28_16-14-56.pngScreenshot_from_2024-05-28_16-15-43.pngScreenshot_from_2024-05-28_16-16-18.pngScreenshot_from_2024-05-28_16-20-05.pngScreenshot_from_2024-05-28_16-28-46.png 
  512   Wed Feb 14 14:06:28 2024 CB AR JMPulser Walkthrough
15:06
Run25

Pulser walkthrough

EGG
Ortec 448 Pulser

Amplitide 90,000-10,000
@ 10,000 step
Normalise 5.0
Attenuators
  
  681   Sat Apr 26 22:01:37 2025 CBProxy bridgeProxy bridge enabling anydesk and generic
Internet access dropped due to atppc025 being
rebooted. Found it dropped again late today.
  
  272   Thu Feb 24 23:15:25 2022 Rui-Jiu Chen, AlexProblems with ion souce.    
  282   Fri Feb 25 11:20:30 2022 CBPressure and temperature data savedSaved pressure reading and temperature
data logs from internal target in /TapeServer/22Feb/OtherData

Leakage current data is saved in
  
  54   Fri Sep 3 08:12:39 2021 CB RSSPressure after overnight pump down03.09.2021   09:00   5.27E-7 mbar     
03.09.2021   13:00   4.08E-7 mbar       
           
 20210903_085646.jpgIMG_4487.JPG 
  66   Fri Sep 10 10:50:55 2021 CB RSS MLPressure after overnight pump downPressure found in 10-7 mbar range.

Decided to leak test anyway for safety.
 20210910_101131.jpg 
  390   Thu Apr 27 19:43:23 2023 CB, JMPreparing to open Removed turbo pump and set aside in a box.
Considering switching to the other turbo
to avoid degradation due to lack of use.
 20230427_123456.jpg20230427_161602.jpg 
  437   Wed Aug 30 10:28:36 2023 CBPreparing for pumps onWe need to connect the non-bakeable (max
80C) wire of the ion pump belonging to the
vacuum division, and we also need to connect
  
  68   Sat Sep 11 16:01:44 2021 CB RSSPreparations for shutdownFound CARME pressure at 2E-7 mbar

Raspberry pi took pictures until 4 am and
 turbo_pump.pnglog_scale.png 
  132   Fri Oct 29 15:09:27 2021 CB JM + RSS OG DRPreparation to mount new DSSDs(Mon 25 October - Tue 26 October)

Considered different strategies
to mount DSSDs inside CARME, while waiting
 6x 
  46   Tue Aug 31 07:09:54 2021 CB RSS (rem) JMPreparation for mounting(30 August 2021)

The current state of YR09 is as per attach
 6x 
  144   Sat Nov 6 14:21:10 2021 CB RSSPreparation for bakeout tent mounting + to do for next weekConnected pneumatic hoses prepared by Gleb.
Opened flow to pressure reducer set at 2
bar. Ok. Attempted to operate pneumatic motors.
  
  50   Wed Sep 1 12:05:28 2021 CB RSSPreparation for CARME on CRYRING YR09Mounted additional cross member for motor

support. See attach 1
 20210901_125504.jpg20210901_125517.jpg 
  387   Mon Apr 24 21:24:26 2023 JMPreparation for CARME dismountCARME currently in vacuum, pressure ~3E-10
mbar. Chamber to be vented tomorrow afternoon
by vacuum division. We have active both pirani
 20230424_155635.jpg20230424_155607.jpg20230424_150526.jpg 
  456   Wed Oct 18 16:47:36 2023 JG, CBPower outageLocal power outage at the CRYRING today,
while JG was trying to activate the ion pumps.
Unlcear what caused it.
  
  163   Fri Nov 26 10:01:45 2021 CB (remotely) MLPower cut in the CRYRING caveML reports power cut in CRYRING cave. Reasons
unknown. No effect on vacuum, but top valve
closed for safety reason. Ramping down temperature.
  
  94   Wed Sep 29 09:27:38 2021 CB (remotely), RSS JM MLPower cutSudden and unexpected power cut at 10:02 German
time, affecting all the target hall.
  
ELOG V3.1.3-7933898