|
|
|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
| CARME, Page 18 of 38 |
 |
|
Thu Feb 8 17:11:50 2024, CB, EH, Pulser walkthrough 
|
Mon Feb 5 12:48:50 2024, CB TD, Pulser walkthough - Run4 
|
Tue May 28 15:25:21 2024, TD, JM, CB, Pulser tests    
|
Wed Feb 14 14:06:28 2024, CB AR JM, Pulser Walkthrough
|
Sat Apr 26 22:01:37 2025, CB, Proxy bridge
|
Thu Feb 24 23:15:25 2022, Rui-Jiu Chen, Alex, Problems with ion souce.
|
Fri Feb 25 11:20:30 2022, CB, Pressure and temperature data saved
|
Fri Sep 3 08:12:39 2021, CB RSS, Pressure after overnight pump down 
|
Fri Sep 10 10:50:55 2021, CB RSS ML, Pressure after overnight pump down
|
Thu Apr 27 19:43:23 2023, CB, JM, Preparing to open 
|
Wed Aug 30 10:28:36 2023, CB, Preparing for pumps on
|
Sat Sep 11 16:01:44 2021, CB RSS, Preparations for shutdown 
|
Fri Oct 29 15:09:27 2021, CB JM + RSS OG DR, Preparation to mount new DSSDs 6x
|
Tue Aug 31 07:09:54 2021, CB RSS (rem) JM, Preparation for mounting 6x
|
Sat Nov 6 14:21:10 2021, CB RSS, Preparation for bakeout tent mounting + to do for next week
|
Wed Sep 1 12:05:28 2021, CB RSS, Preparation for CARME on CRYRING YR09 
|
Mon Apr 24 21:24:26 2023, JM, Preparation for CARME dismount  
|
Wed Oct 18 16:47:36 2023, JG, CB, Power outage
|
Fri Nov 26 10:01:45 2021, CB (remotely) ML, Power cut in the CRYRING cave
|
Wed Sep 29 09:27:38 2021, CB (remotely), RSS JM ML, Power cut
|
|