  290   Sun Feb 27 00:07:15 2022 David, Pierre-MichellNo beam, valve closedAt 00:37 we lost the beam due to a high
pressure burst in the tarjet which resulted
in a valve closed at YR09VV...
  
  332   Mon Feb 28 14:38:15 2022 TDNewMerger statistics
Screenshots of all NewMerger statistics
 37x 
  485   Thu Feb 1 14:45:09 2024 JM, CBNewMerger setupTo include alll 16 FEE modules in the NewMerger
we edited the file /MIDAS/DB/EXPERIMENTS/MERGE/Options/carme-gsi
from MERGE.LinksAvailable string 5 to MERGE.LinksAvailable
  
  633   Fri Jun 14 19:59:14 2024 US, LC, CBNew run with name of 72 is started due to target issue21:00

Target is lost. Background run
is being collected.
 Screenshot_from_2024-06-14_21-08-22.pngScreenshot_from_2024-06-14_21-08-22.png 
  350   Tue Mar 1 16:57:34 2022 CB, LV, PMHNew runBeam issues due to too long storage time
in the last hours. Motors moved out and not
moving.
  
  145   Mon Nov 8 17:19:02 2021 RSS + OGNeg and ion cables connectedNeg and ion pump cables were labeled and
connected.

Kapton tape wrapped around the
 IMG_5480.JPGIMG_5483.JPGIMG_5488.JPG 
  111   Wed Oct 6 15:36:14 2021 CB RSSNeg activation tests -3Attempted to activate 2xUHV1400 connected
to bottom C4, channel #2 using P 200 W, t
rise 30 min, t hold 90 min.
  
  110   Wed Oct 6 09:47:30 2021 CB RSSNeg activation tests -2Attempted activating 2xUHV1400 connected to
top C4, channel #3 with P 300 W (450 C?),
t rise 30 min, t hold 90
  
  4   Wed Aug 19 16:44:39 2020 JMNeg InstallsInternal neg installs completed and electrically
checked. 
 Photos_(1).zip 
  7   Wed Sep 9 21:01:48 2020 JMNeg Feedthroughs4/6 of the neg feedthroughs installed.
Continuity between the power pins, ground
pin and the chamber has been checked, we
 Photos.zip 
  27   Mon Oct 19 13:57:52 2020 JMNeg ActivationNeg and Neg-Ion pumps have been connected
up to the control modules. Controller on
the right is connected to the D-2000s. Middle
 Photos.zip20201019_154921.jpg 
  386   Wed Mar 22 16:33:32 2023 TDNIM WR source
Test of NIM WR source at Edinburgh
 8x 
  127   Mon Oct 18 16:25:11 2021 JM RSS TDNEG rotation + cable removalsKapton cabling and the broken ceramic detector
holder have been separated. Required holding
jacking plate in a vice and using lots of
 Screenshot_20211018-174141_Signal.jpg20211018_111130.jpg20211018_100015.jpg 
  436   Wed Aug 30 09:33:13 2023 CB, OGNEG cables repaired Repaired Neg wires for D2000 with Oemer's
help.

Cable #2 is fine. 
 20230830_102519.jpg20230830_102514.jpg 
  108   Tue Oct 5 17:30:01 2021 CB RSSNEG activation testsFound D2000 #1 activated and at 250C (25W)

to prevent getting dirty when other NEGs
 20211005_131259.jpg20211005_171403.jpg20211005_161317.jpg 
  160   Mon Nov 22 08:06:01 2021 RSS CB + MLNEG activation starts08:20 Temperature of channels 1-3 and 5-6
were reduced to 120 degrees. Immediately
after, the conditioning of the NEGs was stopped
 IMG_5674.JPGCARMEtemps.pngvacplot.png 
  161   Tue Nov 23 08:49:33 2021 CB + MLNEG activation completedFound temperatures and pressure stabilised
overnight. See attached.

12:00 Began activation of 3x UHV1400
 vacplot24.pngCARMEtemps.pngvacplot24-1.pngCARMEtemps-1.png 
  455   Tue Oct 17 08:43:47 2023 CBNEG activation -209:40 - Found temperature and pressure
stablised, but too high to comfortably activate
NEGs closest to detectors. Detector temperature
 Screenshot_2023-10-17_09-45-23.pngScreenshot_2023-10-17_11-04-09.pngScreenshot_2023-10-17_14-56-55.pngScreenshot_2023-10-17_17-58-24.pngScreenshot_2023-10-17_17-58-51.png 
  454   Mon Oct 16 08:28:02 2023 CBNEG activation -19:00 - Michael's online vacuum pressure
plot is no longer working - an old image
is being displayed. CARME temperatures around
 Screenshot_2023-10-16_17-17-30.png 
  439   Fri Sep 1 08:11:40 2023 CBNEG activation - 29:10 Set heaters temperature 300 ->
250 C in preparation for cooling down and
to help keep DSSD temperature down. Started
  