  438   Thu Aug 31 08:36:34 2023 CBNEG activation Found CARME at 50C, a bit cooler than expected,
probably due to invasive tent changes yesterday
to mount missing wires. Increased heaters
  
  255   Wed Feb 23 09:50:19 2022 Laszlo, ThanassisMoving detector inWe are moving the detector in run 56   
  511   Wed Feb 14 08:44:32 2024 CB AR JMMotors test and turbo ONRun number changed 09:44 - Now run 23

Moving motors with the injection

Ring signal very weird, moving
 11x 
  113   Fri Oct 8 17:56:35 2021 CB RSSMotors testAttempted first motor test in XHV. Wired
and connected limit switches and string potentiometer.

Set up raspberry pi to control
 20211008_184731.jpg20211008_184731.jpg 
  117   Tue Oct 12 09:22:37 2021 RSS TD + OG DRMotors problem solvedNeg and ion cables were taken off and were
put in the box.

Top support was taken off.
 IMG_4971.JPGIMG_4970.JPG 
  59   Mon Sep 6 14:13:17 2021 CB MLMotors mounted - first attemptMounted both  motors on CARME. Started 
with outside motor.
 20210906_113522.jpg20210906_113519.jpg20210906_115601.jpg20210906_152607.jpg20210906_143944.jpg 
  411   Sun Jun 25 14:30:06 2023 JM, TDMotors bias testThe motors were moved using the pneumatic
only, in and out for several cycles to gauge
the effect on the vacuum. For the left arm
  
  58   Sat Sep 4 15:54:50 2021 CB RSSMotor mounting preparationPrepared the motors to be mounted and 
found all components required. No issues.
 20210904_162517.jpg20210904_162520.jpg 
  496   Wed Feb 7 10:09:14 2024 CB, JG, EMMorning Shift 11:00

Changed slow comp threshold to
0x32 (500 keV). Checkloaded.
 Screenshot_from_2024-02-07_11-10-08.pngScreenshot_from_2024-02-07_11-10-59.pngScreenshot_from_2024-02-07_11-15-53.pngScreenshot_from_2024-02-07_11-20-38.png 
  676   Fri Apr 18 08:17:38 2025 JMMore testing09:10

Arrived at GSI. Leakage currents
status same as before, DSSD4 is still fluctuating.
 15x 
  38   Mon Aug 9 12:36:00 2021 TD, RSS, ABDMonday 9 August
Attachments 1-5 - CARME shipment in CRYRING
hall
 7x 
  667   Mon Apr 7 08:59:41 2025 TDMonday 7 April
10.00 FEE64 power ON
      CARME IE514 OFF
 8x 
  480   Mon Jan 29 15:32:08 2024 TD, JMMonday 29 January contd.
Test + and test - daisy chain cabling extended
from DSSSD #1 to #2 to DSSSD #1 to DSSSD
 16x 
  479   Mon Jan 29 08:52:07 2024 TD JMMonday 29 January
09.50 CARME IE514 5.1e-11 mbar ( ambient
temperature 16 deg C )
 32x 
  380   Mon Nov 28 13:14:33 2022 AR TDMonday 28 November   12x 
  334   Mon Feb 28 14:47:52 2022 CB, TDMonday 28 February 15:00-23:00
15.51 1.8.W spectra 20ms, 2ms, 200us, 20us
FSR - attachments 1-8
 17x 
  550   Sun Apr 28 23:12:11 2024 TDMonday 28 April00.09 DAQ continues data file R3_21

      DSSSD bias & leakage current OK - attachment
 21x 
  451   Mon Oct 2 08:41:43 2023 TDMonday 2 October09.35 CARME IE514 1.95e-8 mbar, ambient temperature
20.8 deg C
 6x 
  401   Mon May 15 07:34:22 2023 TDMonday 15 May08.35 DSSSD#3 bias -149.95V leakage current
-6.418uA temperature +19.6 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php
)
  
  468   Mon Jan 15 18:51:28 2024 JG, DR, TDMonday 15 January
Cooling water manifolds
  