ISOLDE 44Ti meeting notes 09 Oct 2018 ==To be ordered== *Windows Done *Gas bottles at CERN - Helium and (likely) Argon. Gas bottle will need a regulator (new or old one) Emailed Karl to inquire. N2 necessary? *Spanners to help repair water chiller leak. Done *PPE (Safety) Boots and hardhats for new members *New valves for gas flow system *Gas cell stands for each gas cell Order was submitted. *Photodiodes We have 3 at CERN, but no more in Edinburgh. Order more! *Au foils ==To be repaired / replaced== *Manual gate valve between SEC and Edinburgh chamber Responsible: (Your name here) Lesker quotes £123 for a repair kit. Do we give up? New one has arrived - plan to leak check it Converter flange to check w/ He sniffer ordered, not arrived. *Silena 7100 Quad Bias supply showed false readings during 59Cu exp. Responsible: Katie, Daid, ... Not yet repaired, Peter searches for manual Alternative module was found and tagged for our use, needs testing *ORTEC 474 TFA was returned to Edinburgh, owing to 10 V baseline shift Responsible: Katie, Daid, ... Useful for photodiode trigger. Take replacement back to CERN. Tagged for repair. Alternative module was found and tagged for our use, needs testing *Take additional Pre-amp to CERN for Photodiode? There are several in the Miniball cupboard... *Teflon chamber feet stands Done *Chamber stand wheel struts Responsible: Peter, Daid, Conor, Ruchi Original ones are damaged at the ends, and also too long Maria suggested 120 cm. We measured ~121 cm opening towards garage To make less top-heavy, we can add a lower shelf and stack weight on it Need a measurement of bolt spacing, Ruchi has a friend who can help us. ==Decisions== *How shall we integrate the beam intensity delivered to target? Total integrated current, with efficiency-calibrated Ge detector Talk to Liam? Gold foil w/ back-scattering to photodiode? Needs foil, mounts for foil & photodiode. Other parts prepared. Daid should contact Paul Morrall Alpha scattering in SSDs is most preferred. *Photodiode degrader foil for isobaric check 10, 15, 20 um Al are prepared at CERN, 2 blank frames in Edinburgh What thickness is sufficient for 44Sc / 44Ti separation? (...or other suspected contamination...) Need to know the beam energies! This is quick work. *Target ladder setup How many targets can fit & what should they be? 3 mm collimator Photodiodes (takes two slots) Viewing screen (?) 1 mm collimator (?) Blank target frame (?) ==Work== *Gas cell Responsible: Katie, Conor Vacuum system is set up in Edinburgh, and He gas is available Gas cell eventually needs to go to CERN. New needle valves and some piping for the gas flow control. Many windows, washers, etc are now ready to go! **Window material / thickness 9, 12.5 um Al arrived. 3 um Ti arrived, some holes but maybe serviceable 6 um Ti had order mixup We can get Havar in 2 weeks privately *Chamber alignment Responsible: Peter Black Chamber is currently disconnected from the beam line. Previously, we contacted the survey team to come assist. Alignment parts are all at CERN. *DAQ PC has any further issues to get on the network? Responsible: Tom Davinson (If PC is turned on, contact Ruchi as she would like some data.)