ISOLDE 44Ti meeting notes 23 Oct 2018 ==To be ordered== *Gas bottles at CERN - Helium and (likely) Argon. Gas bottles for He, Ar can be supplied by CERN N2 was also approved, but bear in mind volume required *Spanners to help repair water chiller leak. Ordered but did they arrive? *PPE (Safety) Boots and hardhats for new members *New valves for gas flow system *Gas cell stands for each gas cell Order was submitted. *Photodiodes Order of 10 to arrive 7 Nov *Au foils Order placed with Paul at STFC ==To be repaired / replaced== *Manual gate valve between SEC and Edinburgh chamber New one has arrived - plan to leak check it Converter flange to check w/ He sniffer ordered arrived Awaiting clamps that were ordererd Repair kit was ordered. *Silena 7100 Quad Bias supply showed false readings during 59Cu exp. Responsible: Katie, Daid, ... Not yet repaired, Peter searches for manual Alternative module was found and tagged for our use, needs testing *ORTEC 474 TFA was returned to Edinburgh, owing to 10 V baseline shift Responsible: Katie, Daid, ... Useful for photodiode trigger. Take replacement back to CERN. Tagged for repair. Alternative module was found and tagged for our use, needs testing *Take additional Pre-amp to CERN for Photodiode? There are several in the Miniball cupboard... *Teflon chamber feet stands - done *Chamber stand wheel struts Responsible: Peter, Daid We have the necessary preparations, we await Peter. We will use 118 cm since garage direction is ~121 cm ==Decisions== *How shall we integrate the beam intensity delivered to target? Total integrated current, with efficiency-calibrated Ge detector Gold foil w/ back-scattering to photodiode? Needs foil, mounts for foil & photodiode. Other parts prepared. Alpha scattering in SSDs is most preferred. *Photodiode degrader foil for isobaric check 10, 15, 20 um Al are prepared at CERN, 2 blank frames in Edinburgh What thickness is sufficient for 44Sc / 44Ti separation? (...or other suspected contamination...) Need to know the beam energies! This is quick work. *Target ladder setup -- IMPORTANT How many targets can fit & what should they be? 3 mm collimator Photodiodes (takes two slots) Viewing screen (?) 1 mm collimator (?) Blank target frame (?) ==Work== *Gas cell Responsible: Katie, Conor Gas cell eventually needs to go to CERN. New needle valves and some piping for the gas flow control. **Window material / thickness 9, 12.5 um Al 3, 6 um Ti 2.5 um Havar 3 um Ti, 12.5 um Al are installed with leak rates < 1 Torr/hr. *Chamber alignment Responsible: Peter Black Previously, we contacted the survey team to come assist. Alignment parts are all at CERN. *DAQ PC has any further issues to get on the network? Responsible: Tom Davinson (If PC is turned on, contact Ruchi as she would like some data.)