ISOLDE 44Ti meeting notes 31 Oct 2018 ==ENSAR2 status== We have some information from people, but not enough. When is the deadline? ==Meetings at CERN next week== *Beam energy w/ Alberto *Crane use w/ Olof *Survey team w/ Peter Skypes *RILIS people for laser ideas *Find Liam if we need the alpha source ==To be ordered== *PPE (Safety) Boots and hardhats for new members *New valves for gas flow system Done. Peter will help weld it up later. *Gas cell stands for each gas cell Order is completed. We are awaiting M2 screws now. *Photodiodes Order of 10 to arrive 7 Nov *Au foils Paul at STFC confirmed the order. ==To be repaired / replaced== *Manual gate valve between SEC and Edinburgh chamber New one has arrived - plan to leak check it Awaiting clamps that were ordererd Repair kit was ordered. Maybe Katie can enjoy this. *Silena 7100 Quad Bias supply showed false readings during 59Cu exp. Responsible: Katie, Daid, ... Not yet repaired, Peter searches for manual Alternative module was found and tagged for our use, needs testing *ORTEC 474 TFA was returned to Edinburgh, owing to 10 V baseline shift Responsible: Katie, Daid, ... Useful for photodiode trigger. Take replacement back to CERN. Tagged for repair. Alternative module was found and tagged for our use, needs testing *Take additional Pre-amp to CERN for Photodiode? There are several in the Miniball cupboard... *Chamber stand wheel struts These were mailed to CERN attn: Karl Johnston. He confirmed with DHL. ==Decisions== *How shall we integrate the beam intensity delivered to target? Total integrated current, with efficiency-calibrated Ge detector Gold foil w/ back-scattering to photodiode? Needs foil, mounts for foil & photodiode. Other parts prepared. Alpha scattering in SSDs is most preferred. *Photodiode degrader foil for isobaric check 10, 15, 20 um Al are prepared at CERN, 2 blank frames in Edinburgh What thickness is sufficient for 44Sc / 44Ti separation? (...or other suspected contamination...) Need to know the beam energies! This is quick work. *Target ladder setup -- IMPORTANT Peter has made a jig for us, it looks promising. How many targets can fit & what should they be? 3 mm collimator Photodiodes (takes two slots) Viewing screen (?) 1 mm collimator (?) Blank target frame (?) ==Work== *Gas cell Responsible: Katie, Conor Gas cell eventually needs to go to CERN. **Window material / thickness 9, 12.5 um Al 3, 6 um Ti 2.5 um Havar 3 um Ti, 12.5 um Al are installed with leak rates < 1 Torr/hr. *Chamber alignment Responsible: Peter Black Previously, we contacted the survey team to come assist. We'll have a chat next week. Peter can join w/ Skype. Alignment parts are all at CERN, _except a gas cell prism holder_ *DAQ PC has any further issues to get on the network? Responsible: Daid, Tom Davinson (If PC is turned on, contact Ruchi as she would like some data.) *Cobbling things together at CERN next week Responsible: Daid, Conor, ... What should we take? Rainbows and unicorns. What should we bring back? Some chocolate, maybe ==Simulation code== Responsible: Daid, Alex, Conor, ... Sounds like some people are reinventing the wheel in Canada. What's the best way to collaborate and share? Probably git.