AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 1 of 4  ELOG logo
ID Date Author Subject Text Attachments
  74   Tue Apr 16 12:24:01 2024 EmmanuelMWD amplitude (dE and E)   26Al_PDF.pdf 
  73   Mon Mar 25 12:57:30 2024 ClwAdapters for ntof setup10 new Adapters for lemo to bnc on my desk  20240325_125536.jpg20240325_125528.jpg 
  72   Thu Dec 7 09:48:23 2023 EmmanuelMWDdetector and User InputMWDdetector and UserInput  UserInput_Silicons.hMWDdetector.cc 
  71   Mon Oct 2 08:53:06 2023 EmmanuelEmpty FrameAn empty frame (on the top) was placed
on Friday night.
 Empty_Frame.jpeg 
  70   Thu Sep 28 15:32:16 2023 EmmanuelLiF sample inWe switched from 10B target (number 1)
to LiF target (number 3). We planned to take
this measurement for one day.
 20230928_154334.jpg20230928_155923.jpg20230926_115053.jpg20230928_155747.jpg 
  69   Wed Sep 27 09:54:06 2023 Emmanuel10B sample inWe switched from Aluminium target to Boron
Target (number 1) on Tuesday (26th of
Sept.). The Aluminium target was placed in
 20230926_113136.jpg20230926_113811.jpg20230926_115036.jpg20230926_115053.jpg20230926_111737.jpg 
  68   Tue Sep 5 16:09:45 2023 EmmanuelDrop in gain for DEED 14Dear all,

There was an issue with one of
the strips of the deltaE detector (DEED 14),
 alndeed14.pngalndeed14b.pngalndeed14old.png 
  67   Mon Aug 21 12:08:59 2023 TDRAL108 +/-15V PSU test - JCMB 21.8.23PSU Calex

Setup, PSU and ac mains filter - attachments
 13x 
  66   Sat Aug 19 14:14:26 2023 TDRAL108 +/-15V PSU test - JCMB 18.8.23PSU Calex

Setup and PSU details - attachments 1-3
 10x 
  65   Thu Aug 17 10:26:51 2023 Nikolay SosninData ProcessingTo run raw2root on LXPLUS, you will need
to add the following line to your .bashrc,
performed using
  
  64   Tue Aug 15 11:41:27 2023 TD, NSMonday 14 August - vacuum chamber pressure
08.35 Vacuum chamber pressure OK - see attachment
1
 20230814_083514.jpg 
  63   Tue Aug 15 10:17:39 2023 TD, NSRAL108 +/-15V PSU test at EAR2, n_TOF Monday 14 AugustOn the morning of Monday 14 August 2x RAL108
+/-15V PSUs were borrowed from the Edinburgh
equipment in the ISOLDE hall to check whether
 7x 
  62   Mon Aug 14 11:00:13 2023 TDRAL108 +/-15V PSU test in ISOLDE hall
This morning 2x RAL108 +/-15V PSUs were borrowed
from the Edinburgh equipment in the ISOLDE
 13x 
  61   Sat Aug 12 09:24:19 2023 Nikolay Sosnin26Al ProtonsHere is a Google spreadsheet for counting
protons for the runs:

https://docs.google.com/spreadsheets/d/1INX8G9GAu-M70SdZdz55qXnMZNXKXLW7xfFH-eaLuQw/edit?usp=sharing
  
  60   Fri Aug 11 16:50:58 2023 Nikolay SosninEDET24After inserting aluminium target, previously-dead
channel 24 on EDET was re-plugged into a
12-bit card SPD02872. It is the only EDET
 EDET24_Card.JPGEDET24_Cable.JPG 
  59   Fri Aug 11 13:16:56 2023 Nikolay SosninE Front Incorrect CablingE front 2x16-way to 1x34-way IDC cable
from the Junction Box to the IDC-Lemo 00
adaptor was found to be inserted upside-down
  
  58   Fri Aug 11 13:06:54 2023 AnnieSignal Spreadsheet infoSpreadhseet made for shifters to manually
enter that they have checked each signal
and that they can see gamma-flashes. It is
 IMG_2920.JPGIMG_2921.JPGIMG_2922.JPG 
  57   Fri Aug 11 10:12:02 2023 AnniePressure, voltage and current check   IMG_2915.JPGIMG_2916.JPGIMG_2918.JPG 
  56   Fri Aug 11 10:02:08 2023 TD, NS, ARNoise
Check RAL108 +/-15V PSU
 20230811_104233.jpg20230811_104253.jpg 
  55   Fri Aug 11 09:17:28 2023 AnnieLi target scansProcessed scans of both sides of the Li
target showing the beam spot, and an image
showing what it looks like to the eye.
 7Li_foil_side1_post_processed.pdf7Li_foil_side2_post_processed.pdfIMG_2914.JPG 
ELOG V3.1.4-unknown