AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat May 9 03:50:56 2015
Author
*
:
Subject
*
:
Gzip'd tar file of /MIDAS/DB - attachment 1 Scan of AIDA logbook - attachment 2 AIDA FEE64 power OFF JUlabo FL11006 chiller OFF USB ac mains control OFF Mains power disconnected from ac mains network to AIDA. 2x RJ45 network cables from NetGear Gbit switches to AIDA server aidas1 disconnected and rolled up. AIDA withdrawn from in-beam position within EURICA. AIDA stand, Julabo FL11006 chiller and ac mains transformer moved downstream from EURICA. AIDA snout removed and DSSSD stack dis-assembled.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
MIDAS_DB_090515.tar.gz
Attachment 2:
aida_may2015-0001.compressed.rotated.pdf
Original size: 595x842
Attachment 3:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown