AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sun Mar 30 09:19:22 2025
Author
*
:
Subject
*
:
> > Gzip'd tar file of /MIDAS/DB - attachment 1 > Scan of AIDA logbook - attachment 2 > > AIDA FEE64 power OFF > JUlabo FL11006 chiller OFF > USB ac mains control OFF > Mains power disconnected from ac mains network to AIDA. > 2x RJ45 network cables from NetGear Gbit switches to AIDA > server aidas1 disconnected and rolled up. > > AIDA withdrawn from in-beam position within EURICA. > AIDA stand, Julabo FL11006 chiller and ac mains transformer > moved downstream from EURICA. > > AIDA snout removed and DSSSD stack dis-assembled.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown