AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 19:43:45 2025
Author
*
:
Subject
*
:
> > 18.00 Swapped input cables to nnaida11 and nnaida14 > both cables LH coupler + 2x 34-way Samtec ribbon cables + 3M 1245 1.4mil Copper screen w/ground wire > RH coupler not fitted > both ground wires tied to BNC cable from pulser to AIDA adaptor PCBs at BNC(F)-Lemo-00(M) adaptor > > Before swap, input cable attached to nnaida11 exhibited typical peak widths ~50 ch FWHM, cable > attached to nnaida exhibited double peaking and other structure > > This is unchanged following swap => grounding and/or AIDA adaptor PCB significant *not* cable > > See attachments 1-4 post swap > nnaida11 ASIC 2*L ~40-60 ch FWHM pulser peak width > standard ASIC settings, shaping time 2us
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown