AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:37:32 2025
Author
*
:
Subject
*
:
11.58 Repeat yesterday's test - no significant change observed nnaida11 - input -, shaping time 2us - attachment 1 nnaida14 - input +, shaping time 2us - attachment 2 15.20 invert input polarity - no significant change observed nnaida11 - input +, shaping time 2us - attachment 3 nnaida14 - input -, shaping time 2us - attachment 4 Note - nnaida11 1.12.L pulser peak width ~45 ch FWHM (integrate) Test conducted yesterday and today suggest that it is the grounding and/or the AIDA adaptor PCB that is significant - *not* the particular LH coupler + 2x 34-way ribbon cable + 3M 1245 Cu foil screen assembly or FEE64 polarity Current AIDA adaptor PCB configuration nnaida11 rev C, LK1 fitted nnaida14 rev B, no links fitted 15.37 Add LK1 to nnaida14 AIDA adaptor PCB - no significant change nnaida11 - input +, shaping time 2us - attachment 5 nnaida14 - input -, shaping time 2us - attachment 6
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown