AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 277     Entry time: Sun Jun 5 02:14:10 2016
Author: TD, AE, CG & DK 
Subject: Sunday 5 June 2016 
10.10 Detector biases & leakage currents - OK - see attachments 1-2 

10.40 Detector biases & leakage currents - OK - see attachments 3-4
      30 minutes ~2000Hz highenergy heavy ions during BigRIPS tuning

17.35 Detector biases & leakage currents - OK - see attachments 5-6
      Rates DSSSD #1 - #6 ~500Hz per DSSSD

19.30 AIDA SYNCs lost
      FEE64s power cycled and rebooted

22.30 Detector biases & leakage currents - OK - see attachments 7-8
      Rates DSSSD #1 - #6 ~1kHz per DSSSD

23.00 2mm plate removed from fixed degrader, 1mm installed => net removal of 1mm
      Variable degrader No. 2 in beam, all others out.
Attachment 1: 200.png  12 kB  | Hide | Hide all
200.png
Attachment 2: 201.png  12 kB  | Hide | Hide all
201.png
Attachment 3: 202.png  12 kB  Uploaded Sun Jun 5 03:41:38 2016  | Hide | Hide all
202.png
Attachment 4: 203.png  12 kB  Uploaded Sun Jun 5 03:41:47 2016  | Hide | Hide all
203.png
Attachment 5: 300.png  12 kB  Uploaded Sun Jun 5 10:37:03 2016  | Hide | Hide all
300.png
Attachment 6: 301.png  12 kB  Uploaded Sun Jun 5 10:37:15 2016  | Hide | Hide all
301.png
Attachment 7: 310.png  12 kB  Uploaded Sun Jun 5 15:29:01 2016  | Hide | Hide all
310.png
Attachment 8: 311.png  12 kB  Uploaded Sun Jun 5 15:29:11 2016  | Hide | Hide all
311.png
ELOG V3.1.4-unknown