AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sun Jun 5 17:09:49 2016
Author
*
:
Subject
*
:
<p>00.45 Run R1100 started on n-rich setting (EURICA run_1100, BigRIPS run 1165)</p> <p> Degraders as noted in previous entry</p> <p> Check clock status failed for nnaida5. ADC calib failed for nnaida8. nnaida19 failed Check ASIC clock and Check SYNC errors.</p> <p> Temps ok. Leakage currents ok.</p> <p> Settings file 2016Jun06-00.31.34</p> <p> AIDA fluctuating but all > 0.</p> <p> Tape rate ~8Mb/s.</p> <p> Merge was outputting some interesting looking messages to terminal about queue being full and timestamps going backwards (attachment 3).</p> <p> TapeServer window shows data being written as does repeated ls in /TapeData/NP1306. Writing one file every ~5-7min.</p> <p> </p> <p>01.45 Merger went into 'Want next SYNC'</p> <p> AIDA SYNC rate went to zero and TapeService stopped writing data.</p> <p> Run stopped and FEEs power cycled as contact was lost with ~50%.</p> <p> Beam operators want to do some tuning so control has been given to them while we start back up.</p> <p> </p> <p>02.22 Started run R1101 on n-rich setting (EURICA run_1101-1102, BigRIPS run 1168-1169)</p> <p> Increased fast disc threshold to 5 in all nnaida to prevent merger from running so fast and possibly choking.</p> <p> Stopped @ 04.20</p> <p> Realised after, nnaida24 had been on 1GeV range.</p> <p> </p> <p>04.28 Started run R1102 on n-rich setting (EURICA run_1103, BigRIPS run 1170)</p> <p> Stopped as 04.37 nnaida24 in 1GeV range.</p> <p> </p> <p>04.39 Started run R1103 on n-rich setting (EURICA run_1104, BigRIPS run 1170)</p> <p> Settings file 2016Jun06-04.39.22 -> same as previous settings but nnaida24 changed to 20MeV range.</p> <p> Stopped at 04.59 at request of beam operators.</p> <p> </p> <p>05.11 Started run R1104 on n-rich setting (EURICA run_1105, BigRIPS run 1171)</p> <p> Merger died.</p> <p> Stopped @ 05.15.</p> <p> Ctrl-c out of all tape/merger related windows and restarted them. Setup/Configure etc.</p> <p> </p> <p>05.34 Started run R1105 on n-rich setting ( EURICA run_1106, BigRIPS run 1172)</p> <p> Settings file 2016Jun06-05.34.56 -> nnaida24 reverted back to 1GeV range. New settings file to make sure nnaida24 is set to 1GeV range. Changed in Save/Restore options.</p> <p> Temps ok. Leakage currents ok.</p> <p> Rates in visual scalar ~10% higher.</p> <p> </p> <p>07.22 Lost contact with nnaida4 and merger stopped outputting data.</p> <p> Stopped run R1105.</p> <p> Power cycle FEEs and start new run.</p> <p> On two power cycles, certain FEEs were not contactable.</p> <p> Beam stopped by operators for brief period.</p> <p> </p> <p>08.14 Run 1106 started on n-rich setting (EURICA run_1108, BigRIPS run 1175)</p> <p> Settings file 2016Jun06-05.34.56</p> <p> Temps ok. Leakage currents ok.</p> <p> Stopped 09.06 for setting change.</p> <p> </p> <p>09.41 Run 1107 started on reference mass setting (EURICA run_1200, BigRIPS run 1177)</p> <p> Settings file 2016Jun06-05.34.56</p> <p> </p> <p>11:24 Network link to the outside world is dropped across B3F</p> <p> Beam is being controlled by the primary operators.</p> <p> Run 1108 - background run with beam off from 10:29 to 11:31 (EURCA run 1201, no BigRIPS run)</p> <p> (Was still editing the elog without submitting it. Sorry!)</p> <p> Settings file was saved: 2016Jun06-10.45.31</p> <p> Leak currents from paper logbook in consecutive order bias1 ch0-3, bias2 ch0-1 in uA: 3.225, 4.155, 3.515, 3.315, 3.65, 3.205</p> <p> </p> <p>12.45 start R1110 (AIDA) run_1103 (EURICA)</p> <p> Continuing reference mass measurement following earlier network outage B3F</p> <p> ASIC settings 2016Jun06-05.34.56</p> <p> </p> <p> see attachments 13-20</p> <p> </p> <p>13.30 Stopped R1110 for B3F entry</p> <p> 'unable to connect' to nnaida1 etc</p> <p> AIDA FEE64s reset OK but would not ReSync wuth about half of the FEE64s returning -1 status code</p> <p> power cycle FEE64s, reboot aidas1 & FEE64s</p> <p>14.03 ASIC seetings DB key 2016Jun06-14.03.48</p> <p>14.20 System-wide checks</p> <p> All FEE64s pass all tests *except*</p> <p> nnaida21 ADC calibration</p> <p> nnaida19 ASIC clock timestamp & SYNC errors not counting</p> <p> </p> <p> </p> <p> </p> <p> </p> <p> </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
bias1_run1100-0506-0046.png
Original size: 502x344
Attachment 2:
bias2_run1100-0506-0046.png
Original size: 502x344
Attachment 3:
merge_output_R1100.png
Original size: 741x1009
Attachment 4:
merger_output2.png
Original size: 661x465
Attachment 5:
bias1_R1101_0606-0228.png
Original size: 502x344
Attachment 6:
bias2_R1101_0606-0228.png
Original size: 502x344
Attachment 7:
bias1_R1102_0606-0430.png
Original size: 502x344
Attachment 8:
bias2_R1102_0606-0430.png
Original size: 502x344
Attachment 9:
bias1_R1105_0606-0540.png
Original size: 502x344
Attachment 10:
bias2_R1105_0606-0540.png
Original size: 502x344
Attachment 11:
bias1_R1107_0606-0953.png
Original size: 502x344
Attachment 12:
bias2_R1107_0606-0954.png
Original size: 502x344
Attachment 13:
1.png
Original size: 1510x1030
Attachment 14:
2.png
Original size: 1510x1030
Attachment 15:
3.png
Original size: 1510x1030
Attachment 16:
4.png
Original size: 1510x1030
Attachment 17:
5.png
Original size: 502x344
Attachment 18:
6.png
Original size: 502x344
Attachment 19:
7.png
Original size: 795x777
Attachment 20:
8.png
Original size: 1510x1030
Attachment 21:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown