AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 316     Entry time: Thu Jun 16 03:40:43 2016
Author: TD 
Subject: Thursday 16 June 2016 
10.40 DAQ stalled AIDA75_30 c. 01.36

      SYNC errors since baseline (start of AIDA75) - attachment 1
      SYstem-wide checks ASIC clock timestamp and clock status OK for all FEE64s

      Power-cycle & reboot

11.14 AIDA76 

      ASIC settings 2016Jun12-10.10.08
      BNC PB-4 amplitude 50,000

11.19 AIDA77

      BNC PB-4 amplitude 30,000

11.23 AIDA78

      BNC PB-4 amplitude 10,000

11.28 AIDA79

      BNC PB-4 amplitude 5,000

      All *.L histograms saved c. 11.30 Thursday 16 June 2016
      Example spectra - attachment 5

11.34 Water on floor by AIDA NIM bins/forward AIDA stand/EURICA - it would appear
      that one or more cluster LN2 cryostat inlets have thawed are or thawing - failed fill
      and/or blocked manifold?

      Julabo FL11006 water level and flow looks OK
      FEE temperatures OK - see attachment 4

      Detector bias off
      FEE64 power off
      All AIDA power off

      Source of water was determined to be wheeled air dehumdifier/cooler used to cool crates
      in 19" rack to right of AIDA (looking upstream). This had a small tray tank to collect
      water which was full to overflowing.

      2x 60Co sources (#2530 and CD395) returned to cupboard B3F (between E12 & E17 stairwells)
 
Attachment 1: 70.png  225 kB  | Hide | Hide all
70.png
Attachment 2: 71.png  12 kB  | Hide | Hide all
71.png
Attachment 3: 72.png  12 kB  | Hide | Hide all
72.png
Attachment 4: 74.png  131 kB  | Hide | Hide all
74.png
Attachment 5: 75.png  113 kB  Uploaded Thu Jun 16 04:42:00 2016  | Hide | Hide all
75.png
ELOG V3.1.4-unknown