AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:36:51 2025
Author
*
:
Subject
*
:
<p> I actually topped off the chiller with water tonight as I am returning to Scotland (and then off to CERN) within hours.</p> <p>I added 4 liters on around July 5th, to move the marker from a little under the halfway mark to over the halfway mark. After 2.x weeks, it was still sitting a bit shy of under the halfway mark. This means that in a humid and hot Japanese month like July, AIDA doesn't evaporate more than something like 2 liters in one week. </p> <p>As it's now topped off, I think it's good to go for something like several months.</p> <p>I also note that I use a faucet in the old Nishina Center, rather than passing radiation control, to find a water tap. It's maybe more of a hike but it avoids going through radiation control.</p> <p>Anyway, the point of my elog post is that the AIDA chiller will not be running out of water any time soon, probably not before October, though local members at RIKEN might check it each month etc, or on request. I left the bucket and the large-volume container right sitting by it. I still don't know where the funnel is, so I robbed (borrowed) a kind of 1 liter handled jug with a beaker from a place, and returned it.</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown