AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Mon Aug 1 11:30:07 2016
Author
*
:
Subject
*
:
<p>Logged into aidas1 and opened the nnrpi1 relay control window ... powered up the FEE64s.</p> <p>seperatly connected to ribfdaq and opened a firefox to aidas1:8015.</p> <p>By the time the firefox had appeared on my desktop the FEE64s had started up.</p> <p>Ran through the standard startup. Set thresholds to 255 for all 3 sets of comparators. Disabled all discriminators.</p> <p>Enable histograms. </p> <p>Started DAQ.</p> <p>Using ELOG 74 as a guide logged into nnrpi1 and ran two putty sessions ( USB2 and USB3 ).</p> <p>Based on the instructions in the HV unit manual attached to ELOG75 powered ion all 6 detectors ( current when settled at 100v = 3 to 5uA )</p> <p>Using spectrum broswer at nnaida6 and ASIC4 to control the slow comparator threshold ..... needed to reach 32 before the pulser became visible.</p> <p>Using nnaida6:1.3.L found the pulser peak at channel 32136 with a peak width of 67.73 channels.</p> <p>Then poweroff the HV on all 6 detectors.</p> <p>Power off the FEE64s.</p> <p>Logout of all RIKEN machines and consider the best way to take advantage of the situation which allows the system to be operated completely remotely.</p> <p> </p> <p> </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown