AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:30:53 2025
Author
*
:
Subject
*
:
> > 09.50 DAQ found stopped > No error messages merge/tapeserver - see attachments 1-2 > Most recent data file R7_107 last written to 08.13 23.8.16 > > 10.00 Electrical power to AIDA is off for reasons unknown (power saving/maintenance/trip) > 3-ph circuit to Julabo FL1106 recirculating chiller is unaffected > > 10.20 Analysis of R7_107 (most recent data file) shows data synchronised OK > > 11.30 Yoshida-san informs us that the experimental power to F11 is off for annual inspection/maintenance. > Power should be restored this evening, or possibly, sometime tomorrow. > > 19.00 Power restored > > FEE64 power *off* - as expected following power outage > Detector bias *off* - as expected following power outage > > Startup AIDA > System wide checks, FEE64 temperatures and DSSSD bias/leakage currents - see attachments 3-11 > > 19.24 R8 starts > > slow comparator 0x10 > LEC/MEC fast comparator 0xff > > ASIC settings 2016Aug20-15.34.53 > Discriminator masks -> 0x0 > > BNC PB-4 Pulser > Amplitude 90,000 > x5 attenuator IN > t_r 50ns tau_d 50us > - polarity > INT ref, delay MIN, tail pulse > > 19.31 AIDA SYNC, PAUSE, RESUME, SYNCtime warp, Good data etc statistics - see attachments 12-18
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown