AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 368     Entry time: Sun Oct 2 06:12:54 2016
Author: TD 
Subject: Sunday 2 October 
14.15 DSSSD bias/leakage current OK - see attachments 1-2
      FEE64 temperatures OK - see attachment 3

      B2F/F11 temperature +27.5 deg C, d.p. +10.6 deg C, 34.3 RH %

14.24 R8 starts

      ASIC settings 2016Sep02-18.17.01

      Master MACB serial #13 (see https://elog.ph.ed.ac.uk/AIDA/367)
      Master MACB mode 5

      NIM 50MHz -> Phillips 726 NIM-TTL-NIM -> Master MACB - external clock (rear panel)

      Note Fuji Diamond Tool Ltd 1020 NIM-TTL level adaptor (NIM, pink front panel) with signal
      rise and falltimes quoted as <10ns produced poor quality 25/50MHz clock - the Phillips 726
      has significantly faster rise and falltimes and drices a higher amplitude signal to 50R load.

      BNC PB-4 trigger output -> Ortec SCA -> LeCroy 429A (500ns width) -> Master MACB - Correlation DAQ
Accepted Trigger

      BNC PB-4 frequency c. 26Hz

      Statistics - see attachments 4-14
      Master Timestamp - see attachment 15
      Correlation Status & Control - see attachment 16

      Successive correlation scaler events from R8_0

 ***     MBS information: block:   120 ptr:  7827 data: 0x868068B4 module:  6 information type:  8 information
index:  0 MBS data:68B4 ts: 0x00000019979ADAF8
 ***     MBS information: block:   120 ptr:  7829 data: 0x86812F00 module:  6 information type:  8 information
index:  1 MBS data:2F00 ts: 0x00000019979ADAF8
 ***     MBS information: block:   120 ptr:  7831 data: 0x86820000 module:  6 information type:  8 information
index:  2 MBS data:0000 ts: 0x00000019979ADAF8

 ***     MBS information: block:   126 ptr:  7005 data: 0x8680FDF4 module:  6 information type:  8 information
index:  0 MBS data:FDF4 ts: 0x0000001997D52FF8
 ***     MBS information: block:   126 ptr:  7007 data: 0x86812F0E module:  6 information type:  8 information
index:  1 MBS data:2F0E ts: 0x0000001997D52FF8
 ***     MBS information: block:   126 ptr:  7009 data: 0x86820000 module:  6 information type:  8 information
index:  2 MBS data:0000 ts: 0x0000001997D52FF8

0x2F0EFDF4 - 0x2F0068B4 = 0xE9540 = 955712 * 40ns (assume 25MHz) = 38228480ns = 38.2ms

0x1997D52FF8 - 0x19979ADAF8 = 0x3A5500 = 3822848 * 10ns = 38228480ns = 38.2ms

=> correlation clock frequency = 25MHz

Master MACB (serial #13) mode = 5, 50MHz clock to external clock input (rear panel)
       clock output                             25MHz
       reset output                             reset not observed at DAQ GO
                                                reset observed using Correlation status & control tab -> Force
Correlation Reset
       reset request output                     not tested
       correlation DAQ accepted trigger output  c.26Hz

Could not persuade MACB serial #13 to operate in mode 0, external clock input (rear panel) disconnected) 
Persistent failures to ReSYNC by nnaida11, 12, 17, 18, 19, & 20 (see https://elog.ph.ed.ac.uk/AIDA/357)
following RESET/SETUP, FEE64 power cycle, MACB NIM bin power cycle and re-seating master MACB HDMI cables

Switch back to previous Master MACB serial #11 

Master MACB (serial #11) mode = 0
       clock output                             25MHz
       reset output                             reset not observed at DAQ GO
                                                reset not observed using Correlation status & control tab -> Force
Correlation Reset
       reset request output                     not tested
       correlation DAQ accepted trigger output  not observed
Attachment 1: 1.png  12 kB  Uploaded Sun Oct 2 07:26:34 2016  | Hide | Hide all
1.png
Attachment 2: 2.png  12 kB  Uploaded Sun Oct 2 07:26:34 2016  | Hide | Hide all
2.png
Attachment 3: 3.png  135 kB  Uploaded Sun Oct 2 07:26:34 2016  | Hide | Hide all
3.png
Attachment 4: 4.png  87 kB  Uploaded Sun Oct 2 08:21:19 2016  | Hide | Hide all
4.png
Attachment 5: 5.png  83 kB  Uploaded Sun Oct 2 08:21:19 2016  | Hide | Hide all
5.png
Attachment 6: 6.png  83 kB  Uploaded Sun Oct 2 08:21:19 2016  | Hide | Hide all
6.png
Attachment 7: 7.png  83 kB  Uploaded Sun Oct 2 08:21:19 2016  | Hide | Hide all
7.png
Attachment 8: 8.png  83 kB  Uploaded Sun Oct 2 08:21:19 2016  | Hide | Hide all
8.png
Attachment 9: 9.png  91 kB  Uploaded Sun Oct 2 08:21:19 2016  | Hide | Hide all
9.png
Attachment 10: 10.png  89 kB  Uploaded Sun Oct 2 08:21:19 2016  | Hide | Hide all
10.png
Attachment 11: 11.png  136 kB  Uploaded Sun Oct 2 08:21:19 2016  | Hide | Hide all
11.png
Attachment 12: 12.png  138 kB  Uploaded Sun Oct 2 08:21:19 2016  | Hide | Hide all
12.png
Attachment 13: 13.png  138 kB  Uploaded Sun Oct 2 08:21:19 2016  | Hide | Hide all
13.png
Attachment 14: 14.png  137 kB  Uploaded Sun Oct 2 08:21:19 2016  | Hide | Hide all
14.png
Attachment 15: 15.png  78 kB  Uploaded Sun Oct 2 08:21:19 2016  | Hide | Hide all
15.png
Attachment 16: 16.png  86 kB  Uploaded Sun Oct 2 08:21:19 2016  | Hide | Hide all
16.png
ELOG V3.1.4-unknown