AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:37:32 2025
Author
*
:
Subject
*
:
14.30 Adjusted and checked insertion of AIDA snout into BRIKEN (CH2)n moderator. up-down AIDA snout appears centred (@ (CH2)n centre) and tracks into (CH2)n moderator with no significant vertical movement left right AIDA snout appears centred (@ (CH2)n centre) and tracks into (CH2)n moderator with ~3mm horizontal movement left to right (looking upstream) 15.28 DSSSD bias/leakage current OK - see attachments 1-2 FEE64 temperatures OK - see attachment 3 B2F/F11 temperature +24.8 deg C, d.p. +11.8 deg C, RH 44.4% 16.00 Power off to place ac mains distribution unit between AIDA and BRIKEN 18.34 Power up PCS request for remote data/diagnostics collection
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown