AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:17:39 2025
Author
*
:
Subject
*
:
> > 12.30 Following scheduled power outages of October 8 > > power up AIDA and Julabo FL11006 recirculating chiller > > Julabo FL11006 set point +20 deg C > Temperature +25.3 deg C, d.p. +10.6 deg C, RH 39.3% > > boot aidas1 > aidas1 filesystem checks (fsck) run from c. 12.30 to 15.58 > > System wide checks OK *except* nnaida21 failed ADC calibration > > 16.55 DAQ starts (no data transfer) > > ASIC settings 2016Sep02-18.17.01 > slow comparator threshold 0x10 -> 0x0a > TS_SYNC_PHASE 0 > > DSSSD bias & leakage current OK - see attachments 8 & 9 > FEE64 temperatures OK - see attachment 7 > > 17.30 DAQ stops > > DSSSD bias off > AIDA withdrawn from (CH2)n moderator > DSSSD bias on > > 17.40 DAQ starts > > 19.15 Noticed DAQ stopped producing SYNC pulses at some point. > A reload of the run control tab sees them all as going still, but only 20% are reporting any SYNC output in the stats page. > All FEEs have failed the SYNC errors since baseline check and the values reported by the SYNC pulses received tests vary > by +- 3 of a central value. > See attachments 1-6. > The merger and tape server were not set up before this run and are not currently running. > > TS_SYNC phase changed from 0 -> 1 and ReSYNC > > 22.20 DAQ OK > > AIDA SYNCs OK > All system-wide checks OK *except* nnaida21 fails ADC calibration (no change)
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown