AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:37:10 2025
Author
*
:
Subject
*
:
10.30 DAQ found stopped All FEE64 AIDA SYNC rates zero, AIDA SYNC count ~ 4.4M => DAQ stopped @ 01.40 3He detector DAQ off - no 50MHz clock to Master MACB System wide checks - see attachments 26-18 N.B. It would appear that the DAQ stalled (TS_SYNC_PHASE 1) c. 01.40 and at some later time (c. 06.00) the 3He detector DAQ was powered off which means that AIDA lost the external 50MHz clock to the Master MACB - system-wide screenshots should be interpreted with caution. 14.15 3He detector DAQ 50MHz clock restarted VME and NIM crates ON Excecute command ConfClock_50MHz on 3He detector DAQ computer Power cycle AIDA FEE64s Set TS_SYNC_PHASE 2 DSSSD bias/leakage current OK FEE64 temperatures OK *All* system-wide checks OK B2F/F11 temperature + deg C, d.p. + deg C,RH % ASIC settings 2016Sep02-18.17.01 slow comparator 0x10 -> 0x0a Master MACB serial #13 (see https://elog.ph.ed.ac.uk/AIDA/367) Master MACB mode 5 14.20 DAQ starts (no data transfer) 18.10 DAQ found stopped All FEE64 AIDA SYNC rates zero, AIDA SYNC count ~ 3.4M => DAQ stopped @ 16.50 System-wide checks - see attachments 16-9 Power cycle AIDA FEE64s Set TS_SYNC_PHASE 3 ASIC settings 2016Sep02-18.17.01 slow comparator 0x10 -> 0x0a 20.10 DAQ found stalled System-wide checks - see attachments 8-1 Power cycle AIDA FEE64s Set TS_SYNC_PHASE 0 ASIC settings 2016Sep02-18.17.01 slow comparator 0x10 -> 0x0a 20.35 DAQ starts (no data transfer) slow comparator 0x10 -> 0x0a 18.35 DAQ starts (no data transfer) 20.16 DAQ found stopped All FEE64 AIDA SYNC rates zero, AIDA SYNC count ~ 120k (17/24 FEE64s) or 1.49M (7/24) => FEE64s stopped @ 18.40 & 19.40 20.36 DAQ starts (no data transfer) 23.47 DAQ OK
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown