AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:35:28 2025
Author
*
:
Subject
*
:
11.12 DAQ start (R47) Detector bias and leakage currents OK - see attachments 1 & 2 FEE64 temperatures OK - see attachment 3 Statistics - see attachments 4-14 11.56 Temperature +25.0 deg C, d.p. +8.4 deg C, RH 34.5% 20.33 DAQ found stopped Most recent file R47_120 (last access 18.26) R47_120 ADC data synchronised Restart merger and request DAQ STOP - DAQ stops OK System-wide tests SYNC errors and SYNC pulses - see attachments 15 & 16 - all other tests OK DAQ RESET & SETUP OK Normal restart which failed shortly after enabling ASIC readout - restarting merger did not recover DAQ control - power cycle required 21.05 DAQ starts (R49)
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown