AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sun Oct 16 03:14:41 2016
Author
*
:
Subject
*
:
11.12 DAQ start (R47) Detector bias and leakage currents OK - see attachments 1 & 2 FEE64 temperatures OK - see attachment 3 Statistics - see attachments 4-14 11.56 Temperature +25.0 deg C, d.p. +8.4 deg C, RH 34.5% 20.33 DAQ found stopped Most recent file R47_120 (last access 18.26) R47_120 ADC data synchronised Restart merger and request DAQ STOP - DAQ stops OK System-wide tests SYNC errors and SYNC pulses - see attachments 15 & 16 - all other tests OK DAQ RESET & SETUP OK Normal restart which failed shortly after enabling ASIC readout - restarting merger did not recover DAQ control - power cycle required 21.05 DAQ starts (R49)
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
1.png
Original size: 502x344
Attachment 2:
2.png
Original size: 502x344
Attachment 3:
3.png
Original size: 1298x1027
Attachment 4:
4.png
Original size: 1298x1027
Attachment 5:
5.png
Original size: 1298x1027
Attachment 6:
6.png
Original size: 1298x1027
Attachment 7:
7.png
Original size: 1298x1027
Attachment 8:
8.png
Original size: 1298x1027
Attachment 9:
9.png
Original size: 1298x1027
Attachment 10:
10.png
Original size: 1298x1027
Attachment 11:
11.png
Original size: 1298x1027
Attachment 12:
12.png
Original size: 1298x1027
Attachment 13:
13.png
Original size: 1298x1027
Attachment 14:
14.png
Original size: 1298x1027
Attachment 15:
15.png
Original size: 1298x1027
Attachment 16:
16.png
Original size: 1298x1027
Attachment 17:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown