AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:17:17 2025
Author
*
:
Subject
*
:
> 11.12 DAQ start (R47) > > Detector bias and leakage currents OK - see attachments 1 & 2 > FEE64 temperatures OK - see attachment 3 > > Statistics - see attachments 4-14 > > 11.56 Temperature +25.0 deg C, d.p. +8.4 deg C, RH 34.5% > > 20.33 DAQ found stopped > Most recent file R47_120 (last access 18.26) > > R47_120 ADC data synchronised > > Restart merger and request DAQ STOP - DAQ stops OK > > System-wide tests SYNC errors and SYNC pulses - see attachments 15 & 16 - all other tests OK > > DAQ RESET & SETUP OK > > Normal restart which failed shortly after enabling ASIC readout - restarting merger did not > recover DAQ control - power cycle required > > 21.05 DAQ starts (R49) >
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown