AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:31:32 2025
Author
*
:
Subject
*
:
> > 00.40-02.30 Discussion with PJCS > > Confirm both NIM bin voltages OK > > Move master MACB to lower NIM bin (with BNC PB_4, Ortec 433, 2x CAEN N1419B, 1x CAEN N1419) > successful ReSYNC > system-wide checks clock test fails from zero to all of the following FEE64s - nnaida7, 8, 15 & 16 > SYNC count test OK *except* nnaida19 which has greater number of SYNC pulses > online analysis indicates nnaida19 ADC data not synchronised with other FEE64s by ~200ms > > Replace master MACB rev B mode 0 with MACB module #13 mode 5 (external clock 50MHz TTL) > Move MACB module 2 from upper NIM bin to lower NIM bin > Swap nnaida19/port1 <-> nnaida20/port2 > > Power cycle FEE64s and restart > System wide checks fail - see attachments 1-4 > > Re-seat HDMI cabling master MACB -> MACB modules 3-6 > System wide checks fail - see attachments 7-10 > > Swap ports of 2x HDMI cables from master MACB > Power cycle FEE64s > Re_SYNC & system wide checks fail - see attachments 11-15 > > 10.20 ReSYNC fails for all TS_SYNC_PHASE settings 0-3 > > DK checks MACB mode settings > master -> 5 > module #2 2 > module #3 2 > modules #4-11 3 > > Check HDMI cable seating nnaida6 to master MACB > > No change - ReSYNC fails, system wide checks fail as before > > Per PJCS e-mail check MACB settings per https://elog.ph.ed.ac.uk/AIDA/258 > and change MACB module # 7 from mode 3 to mode 2. MACB settings are now > > MACB # 1 2 3 4 5 6 7 8 9 10 11 spare 1 spare 2 > Mode 5 2 3 3 3 3 2 3 3 3 3 > Rev B y y 50MHz? y > > *BUT* remember the system has been in the previous state since Elog 258 > abd has been working OK > > No change - ReSYNC fails, system wide checks fail as before > > Check 50MHz TTL external clock signal and observe transients and width changes > in clock signal - see attachment 16 > This may not be *the* explanation of current problems but I doubt the the hardware > will be 'happy' with it either > > JAR cycles NIM signal through NIM-TTL signal converter several times to produce > better (no transients or width changes) clock signal with c. 3.2V amplitude > > Power cycle and restart FEE64s > No change - ReSYNC and system wide checks fail - see attachments 17-21 > > 12.40 Re-checked HDMI cabling > found master MACB port 1 -> MACB #7 next, port 2 -> MACB #3 next > change to master MACB port 1 -> MACB #3 next, port 2 -> MACB #7 next > Power cycle FEE64s > > ReSYNC partial failure (left side OK, right side of tree fails), system wide checks fail - see attachments > 22-26 > > 13.05 Swap HDMI cables from master MACB to parents, i.e. HDMI cable master port 1 to MACB #3 next > changes to master port 2 to MACB #7 next > > ReSYNC and system wide checks fail - see attachments 30-34 >
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown