AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Wed Apr 2 01:41:31 2025
Author
*
:
Subject
*
:
<p>20/02/15</p> <p>1400: Measured leakage current as function of bias V for the Caen 1419B high voltage supply and detector BB18 2977-20. (see attachment #1)</p> <p>1500: Modified MACB installed and connected to BELEN and RIBF DAQs (see attachment #2 for signal flow diagram).</p> <p> Increased noise in several nnaida, possibly due to grounding issues introduced by inclusion of modules for other DAQs.</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown