13.35 Swapped HDMI cables from master MACB to MACB #3 & #7 for HDMI cables from MACB #7 ports 1 & 2 to MACB modules #8 & #9 ReSYNC and stsrem wide test failures - see attachments 1-5 15.00 Swap HDMI cable from MACB #2 port 1 to MACB #3 next ReSYNC and system wide test fails - see attachments 6-10 *Conclusion* all of HDMI cables between HDMI cable from nnaida6 and master MACB have now been swapped for other HDMI cables between MACB # 7 and MACB # 8, 9, 10 but we still observe ReSYNC and clock issues 16.05 CG points out that I have misinterpreted Elog 258 - switch back MAC mode settings to the following MACB # 1 2 3 4 5 6 7 8 9 10 11 spare 1 spare 2 Mode 5 2 2 3 3 3 3 3 3 3 3 Rev B y y 50MHz? y FEE64 power cycle ReSYNC and system wide fails - see attachments 11-16 16,50 Re-considering options Install MACB #11 (rev B) mode 0 Will attempt to use 25MHz correlation scaler clock NIM output from master MACB to BRIKEN+RIBFDAQ Power cycle FEE64s ReSYNC OK System wide checks OK but some issues remain - see attachments 17-25 17.10 DAQ starts Writing to disk file R115, merge rate 0.9M data items/, TapeServer ~7Mb/s 17.20 Analysis of R115_1 confirms ADC data synchronised - see attachment 26 17.25 MERGE stats look OK - see attachments 27-29 17.35 System wide tests SYNC errors & SYNC pulses OK 17.38 DAQ stalled - manual start of ORNL clover LN2 fill cycle by Nishimura-san Most recent file R115_5 last accessed 17.38 DAQ stop OK Disable histogram and data transfer #1 DAQ RESET DAQ SETUP Restart merger and TapeServer Enable histogram and data transfer #1 17.47 DAQ start (R116) 17.58 DAQ stopped again at end of fill cycle. 1. Disable histogram and data transfer #1 2. DAQ RESET 3. DAQ SETUP 4. Restart merger and TapeServer 5. Enable histogram and data transfer #1 Had to repeat 1-5 multiple times to get all links working with the merger. R117 created during this (empty). 18.08 Run R118 started. 18.45 TD changing things for runs R119-R120. 18.50 Run R121 started. First few minutes are pulser run 30-10,000 @ 250Hz on coarse dial. 18.54 Beam ON. Continuing R121. Pb shield immediately after final MUSIC detector. 21.35 DAQ continues OK Most recent file R121_30 All system-wide tests OK *but* note nnaida5 now fails clock status test in addition to combinations of nnaida7/8/15/16 Merge/Tapeserver desktop, Merge statistics - see attachments 30-36 21.45 R121_32 ADC data synchronised Overnight Phong Vi completed the pulser walkthrough interrupted earlier this evening. BNC PB-4 amplitude settings 30,000 - 20,000 @ 10,000 step, 8,000-2,000 @ 2,000 step The data is in files R121_62, _63 and _64 (which have been copied to d05 for further analysis).
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown