> 13.35 Swapped HDMI cables from master MACB to MACB #3 & #7 > for HDMI cables from MACB #7 ports 1 & 2 to MACB modules #8 & #9 > > ReSYNC and stsrem wide test failures - see attachments 1-5 > > 15.00 Swap HDMI cable from MACB #2 port 1 to MACB #3 next > > ReSYNC and system wide test fails - see attachments 6-10 > > *Conclusion* all of HDMI cables between HDMI cable from nnaida6 and master MACB > have now been swapped for other HDMI cables between MACB # 7 and MACB # 8, 9, 10 > but we still observe ReSYNC and clock issues > > 16.05 CG points out that I have misinterpreted Elog 258 - switch back MAC > mode settings to the following > > MACB # 1 2 3 4 5 6 7 8 9 10 11 spare 1 spare 2 > Mode 5 2 2 3 3 3 3 3 3 3 3 > Rev B y y 50MHz? y > > FEE64 power cycle > > ReSYNC and system wide fails - see attachments 11-16 > > > 16,50 Re-considering options > Install MACB #11 (rev B) mode 0 > Will attempt to use 25MHz correlation scaler clock NIM output from master MACB to BRIKEN+RIBFDAQ > > Power cycle FEE64s > > ReSYNC OK > System wide checks OK but some issues remain - see attachments 17-25 > > 17.10 DAQ starts > Writing to disk file R115, merge rate 0.9M data items/, TapeServer ~7Mb/s > > 17.20 Analysis of R115_1 confirms ADC data synchronised - see attachment 26 > > 17.25 MERGE stats look OK - see attachments 27-29 > > 17.35 System wide tests SYNC errors & SYNC pulses OK > > 17.38 DAQ stalled - manual start of ORNL clover LN2 fill cycle by Nishimura-san > Most recent file R115_5 last accessed 17.38 > > DAQ stop OK > > Disable histogram and data transfer #1 > DAQ RESET > DAQ SETUP > Restart merger and TapeServer > Enable histogram and data transfer #1 > > 17.47 DAQ start (R116) > > 17.58 DAQ stopped again at end of fill cycle. > 1. Disable histogram and data transfer #1 > 2. DAQ RESET > 3. DAQ SETUP > 4. Restart merger and TapeServer > 5. Enable histogram and data transfer #1 > Had to repeat 1-5 multiple times to get all links working with the merger. R117 created during this (empty). > > 18.08 Run R118 started. > > 18.45 TD changing things for runs R119-R120. > > 18.50 Run R121 started. > First few minutes are pulser run 30-10,000 @ 250Hz on coarse dial. > > 18.54 Beam ON. > Continuing R121. Pb shield immediately after final MUSIC detector. > > 21.35 DAQ continues OK > Most recent file R121_30 > > All system-wide tests OK *but* note nnaida5 now fails clock status test in addition to combinations of > nnaida7/8/15/16 > Merge/Tapeserver desktop, Merge statistics > - see attachments 30-36 > > 21.45 R121_32 ADC data synchronised > > Overnight > > Phong Vi completed the pulser walkthrough interrupted earlier this evening. > BNC PB-4 amplitude settings 30,000 - 20,000 @ 10,000 step, 8,000-2,000 @ 2,000 step > The data is in files R121_62, _63 and _64 (which have been copied to d05 for further analysis).
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown