AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:37:09 2025
Author
*
:
Subject
*
:
10.55 DAQ found to have stopped at 06:47 during LN fill cycle. 10:57 Screen shots of system after stop 11.20 R122 started. System check screen shots attached at 11:08 18.20 System been running stably all day. Leakage currents attachments 14+15. LN2 fill cycle shortly, anticipate DAQ stop. 19.16 DAQ stopped. Closed file R122. 19.37 Temp 25.3 DP 6.1 Hum 31.1 Added 2 extra stacks of lead bricks to protect AIDA. Now ~15cm of lead (Attachment 17) 23.30 DSSSD bias & leakage currents OK - see attachments 18-19 FEE74 temperatures OK - see attachment 20 23.54 DAQ starts (R124) Merge rate 1.8M items/s, c. 13Mb/s to disk c. x2 earlier rates Dominated by significantly higher rates from DSSSD#1 FEE64 #17 ASIC 2*L pulser peak widths ~300 ch FWHM Needs to be investigated at next entry opportunity
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown