AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 428     Entry time: Mon Nov 7 02:13:05 2016
Author: CG, OH, TD, DK 
Subject: Monday 7 November 
11.10 DAQ found stopped. No storage mode so can't tell when, but presumably at 06.30 during LN2 fill cycle.
      Unable to regain control of (see errors after merger restart in attachment 1) system so power cycling FEEs.

11.15 Bias voltages @ ambient temp 25.5oC before DSSD noise investigation (attachment 2+3).

11.40 NB+DK attempting shielding of LN2 solenoid.
      Manual fill initiated. DAQ still stopped at 11.41.
      Unable to regain control of system. Power cycle FEEs while DK+NB install more shielding.

2:55 Made attempts to solve the noise issue that was plaguing DSSD1.
     Attempts at checking the cabling, making sure the detectors were light sealed and switching the bias cables
         around were unsuccessful.
     A blue cable was found to be laying across the snout of AIDA that runs as a temperature probe for one of the
         clover detectors.
     Moving this cable appears to have solved this issue (Has been locked in position). See pulser spectrum in
         attachments 4 and 5

23.15 DSSSD bias & leakage current Ok - see attachments 6-7
      FEE64 temperatures OK - see attachment 8

00.05 DAQ start (R137)
      Pulser Walkthrough
      BNC PB_4 amplitudes 90,000-10,000 @ 10,000 step
      x5 attenuator IN
      t_r 50ns tau 50us
      Frequency 250Hz range
      Polarity -, tail pulse, delay MIN

      ASIC settings 2016Nov07-23.03.06

00.21 DAQ start (R138)
      Amplitude 14,000-2,000 @ 2,000 step

00.42 Background run R139 started. Pulser set to external trigger.

01.01 Run R139 closed successfully.
      
01.04 Started R140 on no storage mode to run overnight.
      Leakage currents @ 01.06 shown in 9+10.
      R140 still running ok @ 01.40.
Attachment 1: merger_error-DAQstop.png  76 kB  | Hide | Hide all
merger_error-DAQstop.png
Attachment 2: bias1.png  12 kB  | Hide | Hide all
bias1.png
Attachment 3: bias2.png  12 kB  | Hide | Hide all
bias2.png
Attachment 4: layout3_711.png  129 kB  Uploaded Mon Nov 7 05:59:16 2016  | Hide | Hide all
layout3_711.png
Attachment 5: layout4_711.png  138 kB  Uploaded Mon Nov 7 05:59:16 2016  | Hide | Hide all
layout4_711.png
Attachment 6: 20.png  12 kB  Uploaded Mon Nov 7 14:16:44 2016  | Hide | Hide all
20.png
Attachment 7: 21.png  12 kB  Uploaded Mon Nov 7 14:16:44 2016  | Hide | Hide all
21.png
Attachment 8: 22.png  134 kB  Uploaded Mon Nov 7 14:16:44 2016  | Hide | Hide all
22.png
Attachment 9: bias1.png  12 kB  Uploaded Mon Nov 7 16:06:39 2016  | Hide | Hide all
bias1.png
Attachment 10: bias2.png  12 kB  Uploaded Mon Nov 7 16:06:50 2016  | Hide | Hide all
bias2.png
ELOG V3.1.4-unknown