AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:36:57 2025
Author
*
:
Subject
*
:
08.15 DAQ found stalled Soft reset OK DSSSD bias & leakage currents OK - see attachments 1 & 2 FEE64 temperatures OK - see attachment 3 Ambient temperature +25.0 deg C, d.p. -0.2 deg C, RH 19.2% System-wide checks OK *except* clock status errors for naida5, 7, 8, 15, 16 ASIC settings 2016Nov07-23.03.06 BNC PB-4 amplitude 90,000 frequency 25Hz range 08.30 AIDA moved into (CH2)n moderator 08.46 Start DAQ (R141) BNC PB_4 pulser OFF Background run with AIDA inside (CH2)n moderator Statistics - good events - attachment 4 per FEE64 1.8.W spectra - see attachments 5-8 09.00 DAQ stops OK System wide checks OK BNC PB-4 pulser ON amplitude 90,000 x5 attenuator IN t_r 50ns tau_d 50us polarity -, delay MIN, tail pulse frequency 25Hz range 14.51 Bias and leakage voltages good (Attachments 9 and 10) 16.30 Ca beam delivered to F11 around 16:30. PB shield still in place up stream of AIDA. DAQ running in no storage mode. Leakage currents @ 16:40 in attachments 11+12. 18.28 DAQ stopped during LN2 fill cycle. Soft reset completed. Will wait 15mins for cycle to complete and the start new run. 18.34 Ca beam stopped. 19.07 Run R146 started on no storage mode. 20.11 DAQ found stopped. Unable to perform soft reset. Power cycling FEEs.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown