AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Tue Nov 8 14:29:34 2016
Author
*
:
Subject
*
:
23:28 Run 4 Start Thick 6mm C target in beam Running with 3.2mm (variable) + 8mm (fixed) of Al degrader. Fixed degrader in same position as R3. Variable degrader reduced to 1mm of Al.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown