AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:37:30 2025
Author
*
:
Subject
*
:
00.15 Setting changed to 71,72,73Ni. All variable degraders in. Will remove while watching rates to settle on degrader setting. F5 CH2 in. F7 CH2 out. F11 C target in. F11 plastic rate 1.2kHz. R5 started. 00.30 Cut F2 momentum slit. F11 plastic rate down to ~400cps. 00.34 Increased primary beam intensity by x2. F11 plastic rate increased to ~800cps. This setting should run until the beam change ~03.00. 00.47 R6 started. All degraders gradually removed but implant rate in DSSD1 only ~10s Hz. 01.03 71,72,73Ni beam stopped for tuning to next setting. R6 stopped. Leakage currents attachments 1+2
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown