AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Tue Nov 8 23:16:15 2016
Author
*
:
Subject
*
:
<p>Recovered AIDA after power cycle (unknown cause of crash from the end of R10)</p> <p>Corresponding run in BRIKEN: 161109_0814_747576Ni_012</p> <p> </p> <p>Run condition for Takechi has changed since our crash</p> <p>F5 empty; F7 CH2; F11 carbon</p> <p>At the beginning of our run, we had all Aluminium degraders in (1 mm was added back after our crash for safety)</p> <p>We finally removed all but 1 mm Al on the variable degrader</p> <p>SSD biases shown as attachments 1 and 2</p> <p>8:20 They inform us that they want to take the F11 carbon out (in the middle of elog entry)</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
R11_USB1.png
Original size: 502x344
Attachment 2:
R11_USB2.png
Original size: 502x344
Attachment 3:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown