AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 446     Entry time: Wed Nov 9 09:50:50 2016
Author: TD 
Subject: NP1412 R20, R21 
DAQ start (R20) failed - nnaida5 dropped data transfer #1 link

start 18.51
stop 19.30
AIDA filename R21
BRIKEN filename 161109_1858_767778Ni_21
BigRIPS filename 410
ASIC settings 2016Nov07_23.03.06
DSSSD bias & leakage currents OK see attachments 1 & 2
Degrader 1mm Al from start of run
F11 rate 450Hz
BigRIPS setting 76-78Ni

19.35 Offline analysis of R21_12

 *** DSSSD # 1 count:       289 old count:       141 dt:      1.01 s  HEC rate:    146.23 Hz
 *** DSSSD # 2 count:       253 old count:       127 dt:      1.01 s  HEC rate:    124.49 Hz
 *** DSSSD # 3 count:       292 old count:       143 dt:      1.01 s  HEC rate:    147.22 Hz
 *** DSSSD # 4 count:       284 old count:       138 dt:      1.01 s  HEC rate:    144.25 Hz
 *** DSSSD # 5 count:       210 old count:        98 dt:      1.01 s  HEC rate:    110.66 Hz
 *** DSSSD # 6 count:        46 old count:        25 dt:      1.01 s  HEC rate:     20.75 Hz

Scalers - see attachment 4

1 F11
2 Upstream plastic top
3 Upstream plastic bottom
4 Si top
5 Si bottom
6 AIDA plastic veto
7 F11 and (upstream plastic top or upstream plastic bottom)
8 F11 and AIDA plastic veto 

19.42 Online analysis confirms ADC data synchronised
Attachment 1: 1.png  12 kB  | Hide | Hide all
1.png
Attachment 2: 2.png  12 kB  | Hide | Hide all
2.png
Attachment 3: 3.png  132 kB  | Hide | Hide all
3.png
Attachment 4: 4.png  624 kB  | Hide | Hide all
4.png
ELOG V3.1.4-unknown