AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Thu Nov 10 12:02:24 2016
Author
*
:
Subject
*
:
21.17 DAQ starts (R30) Pulser walkthrough Amplitude 90,000 - 10,000 @ 10,000 step x5 attenuator IN t_r 50ns tau_d 50us polarity -, tail pulse, delay MIN frequency 250Hz range 21.30 DAQ stops OK 21.32 DAQ starts (R31) Pulser walkthrough Amplitude 10,000 - 2,000 @ 2,000 step 21.40 DAQ stops OK 21.44 DAQ starts (R32) Background BNC PB-4 pulser OFF 21.59 DAQ stops OK 23.45 Started R35 so Jorge can do some tests. No storage mode. 00.20 Carried out manual fill on LN2 in advance of beam arriving later (~03.00). Took around 20mins. Continued writing to R35 after soft reset of DAQ.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
30.png
Original size: 1289x1029
Attachment 2:
31.png
Original size: 1289x1029
Attachment 3:
32.png
Original size: 1289x1029
Attachment 4:
34.png
Original size: 1289x1029
Attachment 5:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown