AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 460     Entry time: Sun Nov 20 02:24:53 2016
Author: CG 
Subject: Sunday 20 November 
11.20 FEE temps and bias leakages ok (attachments 1-3).
      However, stats screen shows no SYNCs being issued and no "Good Events" (attachment 4).
      Stop and Go had no effect -> SYNCs output but SYNC related system checks failed (attachment 5+6).
      Carried out Reset and Setup and returned to normal operation. 

17.20 FEE temps and bias leakage currents ok (attachments 7+8).
      DAQ still running ok.
      BigRIPS tuning through ZDS for next expt.
      15cm Pb upstream of BRIKEN. 
Attachment 1: bias1.png  12 kB  | Hide | Hide all
bias1.png
Attachment 2: bias2.png  12 kB  | Hide | Hide all
bias2.png
Attachment 3: temps.png  132 kB  | Hide | Hide all
temps.png
Attachment 4: DAQstop_sync.png  86 kB  | Hide | Hide all
DAQstop_sync.png
Attachment 5: syncs_received.png  218 kB  | Hide | Hide all
syncs_received.png
Attachment 6: sync_errors.png  225 kB  | Hide | Hide all
sync_errors.png
Attachment 7: bias1.png  12 kB  Uploaded Sun Nov 20 08:20:38 2016  | Hide | Hide all
bias1.png
Attachment 8: bias2.png  12 kB  Uploaded Sun Nov 20 08:20:41 2016  | Hide | Hide all
bias2.png
ELOG V3.1.4-unknown