AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Nov 26 07:11:34 2016
Author
*
:
Subject
*
:
<p>16.11 The cyclotron and BigRIPS condition are now restored and we have good beam</p> <p> Count rate at F11 plastic is ~8 cps</p> <p> At F8, they are focued on 41Al (D5 Brho = 7.5235 Tm)</p> <p> At F11, they are focused on 40Mg (D8 Brho = 6.3208 Tm)</p> <p> Presently around Run R9_19</p> <p> 3mm Pb is on the exit window of the first MUSIC at F11</p> <p> All variable degraders were out (that is not what we intended to have...see next note below)</p> <p> </p> <p>16.35 The variable degraders were not in the positions we thought. Now we make it as follows:</p> <p> Variable degraders 1.0 mm W (+1 mm Al) and 0.3 mm W (+1 mm Al)</p> <p> R9_24 just began</p> <p> </p> <p>18:00 Beam stopped for stripper foil change</p> <p> Moved Pb degrader downstream, from window of MUSIC1 detector to hole of polyethylene shield in front of BRIKEN.</p> <p> </p> <p>18:12 Stopped AIDA DAQ at run R9_43 (Ge filling will start soon)</p> <p> </p> <p> </p> <p> </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown