AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:31:57 2025
Author
*
:
Subject
*
:
> 00.07 BigRIPS data file 1135 > > 01.07 BigRIPS data file 1136. > > 02.09 BigRIPS data file 1137. > > 02.13 Beam off. ~1/2 way through R44_137 > > 02.16 Beam back. ~600MB into R44_139 > BigRIPS data file 1138. > > 03.17 BigRIPS data file 1139. > > 03.37 Beam stopped. End of R44_167. > > 03.43 Beam returned to F11. ~700MB through R44_170. > BigRIPS data file 1140. > > 04.00 Beam off for stripper foil change. End of R44_175. > > 04.06 Beam returned to F11. 1.2GB into R44_178. > > 04.08 BigRIPS data file 1141. > > 05.09 BigRIPS data file 1142. > > 06.02 BigRIPS data fill 1143. > > 06.26 R44 stopped @ R44_227 ahead of LN2 fill. > > 07.02 BigRIPS data file 1144. > > 07.43 Run R45 started. > > 08.02 BigRIPS data file 1145. > > 08.05 Local Elog and BigRIPS log uploaded (attachments 3-6). > > 09.00 Machine time ended, the last data file is R45_18 > > 13.40 Biases are shown as attachments 7 and 8 > > 15.04 DAQ starts (RIBF03R1/R46) > Pulser walkthrough > Amplitude 90,000 - 10,000 @ 10,000 step > x5 attenuator IN > t_r 50ns tau_d 50us > frequency 250Hz range > polarity -, tail pulse, delay MIN > > 15.19 Walk through finishes. See attachments 9 and 10 for histograms > > 15.26 DAQ starts (RIBF03R1/R47) > Pulser walkthrough > Amplitude 12,000 - 2,000 @ 2,000 step > > 15.35 R47_2 finishes. > See attachments 11 and 12 for histograms > > 15.41 DAQ starts (RIBF03R1/R48) > Background - BNC PB-4 pulser OFF > > 16.35 DAQ stops OK (RIBF03R1/R48_13) > > 16.55 DSSSD bias & leakage currents Ok - see attachment 13 & 14 > Ambient temperature +25.2 deg C, -4.2 deg C, RH 14.2%
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown