> 02:02 Recovered DAQ from crash. Merger became clogged and the system required a full restart. Raspberry pi also > required a restart to regain control of the USB power relay. > AIDA R16 started > BigRips on run 0143 which started at 01:19 > BRIKEN run 2 > > Biases and leakage currents ok see attachment 1 > Screenshots attached for good events, sync, pause and resume (attachments 2-5) > > 02:23 BigRips started run 0144 > AIDA on run R16_5 > BRIKEN run 3 > > 02:47 All system wide checks ok > > 03:25 BigRips Run 0145 > AIDA run R16_22 begins at 03:26 > BRIKEN run 4 > All system wide checks ok > > 04:00 Biases and leakage currents ok (attachment 6) > > 04:25 BigRips has stopped. AIDA run R16_37 > brief stop in beam time as Shunji got access to the area and removed the fixed degrader. > In the hope that we were stopping ions before they reached AIDA. > It is now attached to the furthest upstream variable degrader. > > 04:29 bigRips run 0146 > AIDA run R16_38 > BRIKEN run 5 > System wide checks ok, ASICS settings checked > > 05:31 BigRips beam stopped. Carbon foil change > AIDA file run R16_54 > BRIKEN also stopped > Was running with 13mm of Al. Switching to 11mm of Al degrader. > > 05:41 BigRips start Run 0147 > AIDA file R16_57 starts at 05:52 > BRIKEN run 6 > System wide checks all ok. > > 06:00 Bias and leakages ok (see attachment 7) > > 06:26 System wide checks ok > > 06:43 BigRips stopped their run. > AIDA currently on R16_73. Still running even after LN2 fill. > > 07:17 BigRips start run 0148 > AIDA run R16_81 > BRIKEN run 7 > System wide checks and ASIC load all ok > > 07:42 Bias and leakage currents ok (see attachment 8) > > 08:22 System wide checks all ok > > 08:36 BigRips started run 0149 > AIDA file R16_104 > > 08:41 BRIKEN run 8 > > 09.30 System-wide checks all ok. > Leakage currents ok (see attachment 10). > > 09.43 BigRIPS run 0150 starts. Corresponds to the beginning of R16_125. > > 10.35 System-wide checks all ok. nnaida1 still fails clock status check, but bit 2 is set. > Leakage currents ok. > R16_141. > > 10.44 BigRIPS run 0151 starts. Corresponds to the end of R16_142. > > 11.40 System-wide checks all ok. nnaida1 still fails clock status check, but bit 2 is set. > Leakage currents ok. > R16_141. > > 11.45 BigRIPS run 0152 starts. Corresponds to end of R16_159 > > 12.00 Leakage currents all ok (see attachment 11). > > 12.47 PE16/R16_178 > BRIKEN file 11 > BigRIPS run0153 > > 12.50 System wide checks OK *except* nnaida1 fails global clocks 6 > ASIC check control > > 13.41 1.8.H and 1.8.W spectra > > 13.43 System wide checks OK *except* nnaida1 fails global clocks 6 > > 14.03 BigRIPS run 0154. > Roughly start of R16_199. > > 14.21 BigRIPS run 0155. > Start of R16_204. > > 14.50 System-wide checks all passed except nnaida1 fails global clocks 6. > Leakage currents ok. > > 15.23 Beam off. ~Half way through R16_220. > Degrader reduced from 11mm to 8mm. > Previously no pulser visible in p-side FEEs. Jiggled pulser cabling and pushed all LEMO connectors in. > Pulser no visible in 1.8.L for all p-side FEEs. > > 15.28 Beam returned. End of R16_221. > BigRIPS file 0156. > > 15:40 STQ problem so beam stopped near start of R16_225. > > 16.05 Beam returned to F11. 1.7G into R16_231. > BigRIPS file 0157 > BRIKEN file 15 > System-wide checks all passed except nnaida1 fails global clocks 6. > Leakage currents ok. > > 17.20 BigRIPS file run0158 > > 17.38 Bias & leakage currents OK - see attachments 16-17 > FEE64 temperatures OK - see attachment 18 > > Statistics - good events, AIDA disc, SYNC, PAUSE, RESUME, correlation L - see attachments 19-24 > Merge statistics - see attachments 25-26 > > 17.40 System wide checks OK *except* nnaida1 fails global clocks 6 > > 18.21 BigRIPS run0159 > AIDA R16_269 > BRIKEN file 17 > > 18.44 System wide checks OK *except* nnaida1 fails global clocks 6 > > 19.31 BigRIPS run0160 > AIDA R16_288 > BRIKEN file 18 > > 19.55 System wide checks OK *except* nnaida1 fails global clocks 6 > > 20.22 BigRIPS run0161 > AIDA R16_300 > BRIKEN file 19 > Degrader 8mm Al (unchanged) > > 21.32 BigRIPS run0162 > AIDA R16_318 > BRIKEN file 20 > Degrader 8mm Al (unchanged) > > 21.32 Bias & leakage currents OK - see attachments 27-28 > FEE64 temperatures OK - see attachment 29 > > 21.38 System wide checks OK *except* nnaida1 fails global clocks 6 > > 22.16 BigRIPS run0163 > AIDA R16_329 > Degrader 8mm Al (unchanged) > > 22.30 System wide checks OK *except* nnaida1 fails global clocks 6 > > 22.33 AIDA synchronised - R16_333 - see attachment 30 > > 23.07 BigRIPS run0163 > AIDA R16_341 > BRIKEN > Degrader 8mm Al (unchanged) > > 23.28 ASIC settings 2017Mar27-16.12.39 > > BNC PB-4 > Amplitude 90,000 > x5 attenuator IN > t_r 50ns tau_d 50us > frequency 25Hz range > polarity- > tail pulse, delay MIN > > 23.35 System wide checks OK *except* nnaida1 fails global clocks 6 > > 23.28 Analysis of data fileR16_347 - see attachment 31 > > 23.48 daid on shift.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown