AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:31:08 2025
Author
*
:
Subject
*
:
> 00:11 BigRIPS has started a new run at 00:10:42 run 0165. > AIDA subrun R16_357 was about halfway (~1 GB) at 00:11. > BRIKEN run 21 ( so-called 170331_0012_Mg40 ) > > Check clock status: FEE64 module nnaida1 global clocks failed, 6 [ as usual, and it is set to ch 2 ] > ADC calib all pass > Clock timestamp, passed > Sync counter error, passed > Sync pulses all consistently near 3 x 10^7 > Memory info from Linux FEE64 all around 35k to < 40k > > Sync check on the BRIKEN terminal is looking all consistent to me. > > Temperatures are seen as attachment 1, temps_31_a.png > Biases and leak currents seen as attachment 2, bias_31_a.png > > As for what I've checked then we continue on in what appears to be a stable condition. > > 01:12 I can see BigRIPS team at their DAQ PC about to change the run. > 2017-03-31 01:12:24 BigRIPS run 0166 starts > AIDA subrun R16_372 is 75% finished at 1:12 > BRIKEN run 22, [ 170331_0114_Mg40 ] -- timestamp beginning at 1:14 means they are almost exactly at the > beginning of AIDA R16_373 > > Check clock status, ibid to above > Check ADC calib, ibid > Check ASIC clock timestamp, ibid > Check sync errors, ibid > Check sync pulses, 3.2 x 10^7 consistently > Check FEE64 memory, 36k to 37k. > > Sync check at BRIKEN is still running and shows the clocks are lined up. > > Continue. > > > 02:10 BigRIPS begins a new run, number 0167 > AIDA subrun R16_386 finished at 2:10, so BigRIPS 0167 should correspond nicely with the start of AIDA R16_387 > BRIKEN run number 23 [ 170331_0214_Mg40 ] > > All six (6) system wide checks were performed. The situation remains stable as above. > > 03:13 BigRIPS starts a new run at 3:12:51 > AIDA R16_402 is about 50% complete at 3:13 > BRIKEN 24 [ 170331_0314_Mg40 ] > > All system-wide checks are passed. Number of sync pulses is ~3.7 x 10^7 > > 03:33 Bored so here's some spectra, attachment 3 as pulses_31_b.png. It looks good. > > 04:10 BigRIPS run 0169 began at 2017-03-31 04:09:50 > AIDA is R16_416 50% though at this time. > BRIKEN 25 [ 170331_0413_Mg40 ] > > All checks passed. I'm not just writing it, but they were performed :) > > See attachment 4 for bias. had screencapped temp but forgot to update so it was just a clone of attachment 1 (this > was noticed at 8:07) > > 04:58 Beam operators called. They stopped the beam so they can exchange the carbon stripper foil. > AIDA R16_428 was 25% through at 4:58. > > 05:02 R16_429 is at 600 MB I hear the chime to indicate the beam is back > BigRIPS 2017-03-31 05:02:57 run 0170 is started > BRIKEN run 27 [ 170331_0504_Mg40 ] -- NB: Run 26 was junk (some mistake) > > All six (6) system wide checks are a go. 3.7 x 10^7 is the sync pulse count. > Continue. > > 05:12 I show you the AIDA look good in attachment 5 spec_31_c.png > > 06:10 still waiting on BigRIPS to notice what time it is. > > 06:14 BRIKEN sends the resync. (this note is written at 7:11..see below) > > 06:16 R16_447 Jorge realizes there are no neutrons in BRIKEN, and we realize the second beam physicist is on the phone. > > 06:29 Beam physicists hang up the phone...2017-03-31 06:29:30 BigRIPS run 0171 > AIDA run R16_451 is almost exactly beginning at 6:29 > BRIKEN run number 28 > The system wide checks are consistent as before > FEE64 module nnaida1 global clocks failed, 6 > Check sync pulses sees 3.9 x 10^7 > > 06:36 - I asked the BigRIPS team the situation. Basically, they calibrate the faraday cup and also three plastic > scints near F0 (primary target) for calibrartion (cross section estimation) purposes. > So it seems in this time THEY have the beam yet we do not because it is not reaching all the way to F11 the > entire time. > Though I do not want to bother the operators with too many questions, it can be that parts of BigRIPS run 0170 > near the end will not correlate with our data. > > 07:11 - I had not caught that BRIKEN sent the resync. It was confirmed that it was the only resync issued tonight. > Please see the attachment 6 "spec_31_d.png", though I'm not sure it would be useful > > 07:47 Not sure the situation. Beam physicists were near their DAQ PC for a bit, then on the phone, but their run has not > restart. > AIDA run R16_469 at this time, just to note. > > 07:57 2017-03-31 07:55:33 BigRIPS run 0177 is started. Evidently run 0176 is skipped somehow. > AIDA R16_471 was at 1.9 GB at 7:57 so probably it mostly correlates with the start of the BigRIPS run. > BRIKEN run number 29 (?) [ 170331_0758_Mg40 ] > > [8:15 - confirmed the problem with beam physicists was a DAQ issue. Thus BigRIPS run 0172 is junk, and they took > some time to resolve their issue.] > > System-wide checks look normal. 4 x 10^7 sync pulses > Attachments 7 and 8 have bias and temp ("bias_31_e.png" and "temp_31_e.png") > > 08:07 When doing the temperature this time, I realized that an early temperature "temp_31_b" was just a clone of > "temp_31_a" as I forgot to refresh. Now the attachment numbering changes as I delete it, and the elog is updated to > correctly reflect the new ordering. I should be more careful. > > 08:56 BigRiips start run 0174 > End of AIDA file R16_485 > BRIKEN file 31 > System wide checks all ok *except* nnaida1 fails global clocks 6 > ASIC check all ok > > 09:44 BigRips stopping the beam > Half way through AIDA file R16_498 > > 09:57 System wide checks all ok *except* nnaida1 fails global clocks 6 > > 10:01 BigRips start run 0175 > Start of AIDA file R16_502 > BRIKEN file 32 > > 10:11 Biases and leakage currents ok (See attachment 9) > > 10:19 BigRips start run 0176 > End of AIDA file R16_506 > > 10:23 BRIKEN start file 33 > AIDA on file R16_507 > > 11:21 BigRips start run 0177 > End of AIDA file R16_521 > BRIKEN start file 34 > System wide checks all ok *except* nnaida1 fails global clocks 6 > Temperatures ok (See attachment 10) > > 12:21 BigRips start run 0178 > AIDA file end of R16_536 > BRIKEN start run file 35 > System wide checks all ok *except* nnaida1 fails global clocks 6 > ASIC load check ok > > 12:43 Biases and leakages are ok (See attachment 11) > > 13:20 BigRips run 0179 > AIDA halfway through R16_551 > BRIKEN start run file 36 > System wide checks all ok *except* nnaida1 fails global clocks 6 > > 13:39 bigRips run 0180 > AIDA file end of R16_555 > > 14:44 System wide checks all ok *except* nnaida1 fails global clocks 6 > ASIC load check ok > Temperatures all ok (See attachment 12) > Biases and leakage currents ok (see attachment 13) > > 15:14 BigRips is stopped > AIDA file R16_579 > > 15:16 BigRips started run 0181 > AIDA file end of R16_579 > > 15:24 BRIKEN starts file 37 > AIDA file 3/4 of R16_581 > > 16.18 BigRIPS file 0182. > Just after start of R16_595. > BRIKEN file 38 starts @ 16.21. > > 16.55 All system-wide checks ok except nnaida1 fails global clocks 6. > Temps, bias and leakage currents (see attachment 14) all ok. > > 17.18 BigRIPS run 0183. > ~1/2 way through R16_609. > BRIKEN run 39. > > 18.27 BigRIPS file 0184 started. Start of R16_627. > > 18.31 Beam stopped at F11 for stripped foil change. Very end of R16_628. > > 18.38 Beam returned to F11. 1.3GB through R16_630. > BigRIPS file 0185. > BRIKEN run 40. > > 19.15 System-wide checks as previously. > > 19.38 BigRIPS file 0186. End of R16_654 > > 19.43 BRIKEN file 41 started. > > 20.48 BigRIPS file 0187 started for 30Ne tuning. > BRIKEN will not be taking data. > > 20:50 AIDA stopped on file R16_663 > Stopped as end of 39Na and the start of the BigRIPS sweep of settings. > > 20:52 BigRips starting with 30Ne > > 20:53 Started AIDA file R17. Centring beam along ZDS. > F11 rate ~50cps. All variable degrader in (19mm). > > 20.58 BigRIPS file 0188 started. > > 21.04 30Ne setting started. BigRIPS file 0189 started. > > 21.20 30Ne stopped for 31Ne centring. BigRIPS file 0190. > > 21.27 BigRIPS file 0191 started for 31Ne yield measurement. > (JLT has spoken with operators and it seems up until now beam has been stopped at F7. We are taking this to be the > case unless advised otherwise.) > > 21.59 BigRIPS file 0192 started on 32Ne yield setting. Beam to F11. > > 22.01 R17 stopped and R18 started. > > 22.05 32Ne setting finished. > R18 stopped. > > 22.19 BigRIPS file 0194 started for 34Ne setting. > AIDA run R19 started. > BRIKEN run 43. > Currently 10mm degrader but LISE predicts everything should pass through. > > 22.43 Degrader changed to 19mm Al at start of R19_6. > LISE predicts implants in DSSD#2. > > 23.23 Beam stopped to F11. 1.8 GB into R19_15. > > 23.25 Beam returned to F11. 1GB into R19_16. > BigRIPS file 0195. > Degrader reduced to 16.8mm Al.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown