AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:30:43 2025
Author
*
:
Subject
*
:
> 00:12 BigRips started run 0223 (Started at 00:12) > AIDA file R20_344 > System wide checks all ok > BRIKEN start run 67 > > 01.38 Beam stopped to F11. ~1/2 way through R20_364. > > 01.43 Beam returned to F11. 1GB through R20_366. > BigRIPS file 0224. > BRIKEN run 68. > System-wise checks all ok, except nnaida1 global clocks failed 6. > Temps ok. Leakage currents ok (see attachment 1). > > 02.43 BigRIPS started run 0225. Start of R20_381 > > 02.48 BRIKEN run 69 started. Start of R20_382. > > 03.28 System-wide checks same as previous. (R20_391) > > 03.43 BigRIPS file 0226. ~1/2 way through R20_394 > > 03.48 BRIKEN run 70 started. > > 04.46 BigRIPS file 0227 started. End of R20_410. > > 04.48 BRIKEN run 71 started. Start of R20_411. > > 05.31 36Ne setting is over. End of R20_421. > BigRIPS team is changing setting for calibration. No beam will go through Zerodegree > > 05.51 R20 stopped (I was getting food). > > 06.30 20mm Al degrader + 3mm plastic removed from F8. 23mm Al degrader placed at F11 after IC. > > 06.35 BigRIPS file 0237 started - 38Mg setting. > > 06.37 R21 started on 38Mg setting. > > 06.57 Beam stopped to F11 - accelerator problem. > ~700MB into R21_5. > Returned shortly after. > > 07.23 BigRIPS file 0245 started. ~3/4 way through R21_10. > > 07.26 BigRIPS file 0246 started. ~1/2 way through R21_11. > > 07.32 BigRIPS file 0247 started. Start of R21_13. > > 07.34 BigRIPS file 0248 started. ~1/2 way through R21_13. > > 07.38 BigRIPS file 0249 started. ~1GB into R21_15. > > 07.40 BigRIPS file 0250 started. Start of R21_16. > > 07.41 BigRIPS file 0251 started. Little way through R21_16. > > 08.06 38Mg setting finished. R21 stopped. > > 08.08 R22 started - got a bit trigger happy with the DAQ. No beam to F11. > > 08.10 Degrader set to 10mm Al. > > 08.16 BigRIPS file 0252 started on 39Al setting. > > 08.17 R23 started on 39Al setting. > > 08.20 R23 ended. > > 08.26 40Si setting. Too high rate for AIDA so beam won't be sent down ZDS. > > 08.40 F11 degrader set to 15mm Al fixed + 4mm Al variable (all in). > > 08.43 2nd run at 39Al setting. > BigRIPS file 0254 started. > R24 started. > > 09.00 R24_4 closed. May have been issues with degrader - not sure we were implanting in AIDA... > End of experiment! > > 09.07 AIDA background run started - R25. > Pulser is on in the run though. > > 09.20 R25 ended. > BigRIPS run summary attached.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown