AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Wed Apr 2 01:41:44 2025
Author
*
:
Subject
*
:
<p>To do (roughly in order):</p> <ul> <li> Move shipped boxes down from Gabor's office to the experimental area. Check contents. Should include: <ul> <li>3x 3Tb HDD</li> <li>NIM floating HV supply</li> <li>2x Si detector boxes, containing MSL type BB18 detectors 3131-9 + 3131-11 and 3058-9 + 3058-25</li> <li>flex circuit tester</li> <li>misc items including Al plates, grub nuts etc.</li> </ul> </li> <li>Put everything back into working positions @ F11.</li> <li>Put computer table back to normal. Turn on/check aidas1.</li> <li>Reconnect power to chiller. Check water levels, fill if needed. Turn on and check for leaks.</li> <li>Install PSUs, USB and network switches in new AIDA base.</li> <li>Set up Raspberry Pi.</li> <li>Check modified PSU voltages.</li> <li>Reconnect FEE64s (power/network/HDMI). Label everything.</li> <li>Power on. Check <ul> <li>Basic pusler test to check function and server. Confirm FWHMs are as expected.</li> </ul> </li> </ul> <p> </p> <p>Late Monday or on Tuesday:</p> <ul> <li>Talk to Shunji re. AIDA/BRIKEN + EURICA setup requirements.</li> <li>Install Al/Si accordingly.</li> <li>Complete AIDA build with snout, kaptons etc.</li> <li>Acquire sources (Am/Bi) for source test ------> Speak to Gabor first thing about this.</li> </ul>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown