<p>To do (roughly in order):</p>
<ul>
<li> Move shipped boxes down from Gabor's office to the experimental area. Check contents. Should include:
<ul>
<li>3x 3Tb HDD</li>
<li>NIM floating HV supply</li>
<li>2x Si detector boxes, containing MSL type BB18 detectors 3131-9 + 3131-11 and 3058-9 + 3058-25</li>
<li>flex circuit tester</li>
<li>misc items including Al plates, grub nuts etc.</li>
</ul>
</li>
<li>Put everything back into working positions @ F11.</li>
<li>Put computer table back to normal. Turn on/check aidas1.</li>
<li>Reconnect power to chiller. Check water levels, fill if needed. Turn on and check for leaks.</li>
<li>Install PSUs, USB and network switches in new AIDA base.</li>
<li>Set up Raspberry Pi.</li>
<li>Check modified PSU voltages.</li>
<li>Reconnect FEE64s (power/network/HDMI). Label everything.</li>
<li>Power on. Check
<ul>
<li>Basic pusler test to check function and server. Confirm FWHMs are as expected.</li>
</ul>
</li>
</ul>
<p> </p>
<p>Late Monday or on Tuesday:</p>
<ul>
<li>Talk to Shunji re. AIDA/BRIKEN + EURICA setup requirements.</li>
<li>Install Al/Si accordingly.</li>
<li>Complete AIDA build with snout, kaptons etc.</li>
<li>Acquire sources (Am/Bi) for source test ------> Speak to Gabor first thing about this.</li>
</ul> |