Entry time:
Sun Mar 30 09:19:21 2025
Author
*
:
Subject
*
:
> 10:44 System wide checks all ok > Leakages and biases all ok (see attachment 1) > Ambient Temperature 24.4C - Humidity 38.1% - Dew Point +9.1 > FEE temperatures ok (see attachment 2) > DAQ, Merger and Tape server all still running ok > Good events statistics (see attachment 3) > > Orientation of RS-232 cards was wrong. They have now been corrected will enable logging then do a halt and > go on the daq. > Power supply also moved onto AIDA circuit. > > 11:00 Current file R15_333. > > 11:04 halt and go performed > 24 Log files produced on Rasp Pi console monitor.