AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:35:27 2025
Author
*
:
Subject
*
:
> 10.35 DAQ continues OK > Current file May2017/R19_253 > > ASIC settings 2017Mar27-16.12.39 *except* > slow comparator 0x0a > LEC/MEC fast comparator 0xff > > Detector biases; leakage currents OK - see attachment 1 > FEE64 Temperatures OK - see attachment 2 > good events; statistics OK - see attachment 3 > No warnings/errors reported by merger since DAQ GO - see attachment 4 > > *all* system wide checks OK *except* ADC calibration of nnaida7 > > 10.38 E17/F11 ambient temperature +24.7 deg C, RH 40.7%, d.p. +10.7 deg C > Julabo FL11006 set point +20 deg C, actual +20.0 deg C, water level OK (c. 75%) > > 10.39 DAQ stops OK > Current file May2017/R19_253 > Deleted R19* > > ASIC settings 2017Mar27-16.12.39 *except* > slow comparator 0x0a > LEC/MEC fast comparator 0xff > > BNC PB-4 settings > Amplitude 90,000 > x5 attenuator IN > t_r 50ns, tau_d 50us > polarity - > rate 250Hz range > delay MIN, tail pulse > > Check ASIC Control x2 > Zero all spectra > > 10.47 DAQ starts > File May2017/R20 > Ras Pi system console logs for USB0 attached - see attachment 5 > Analysed R20_0. All appears to be working fine. Highest dead time ~0.3% - see attachment 6 > Off-line analysis of R20_0 confirms ADC data and discriminator are synchronised - see attachments 7,8,9 Concerning nnaida7 and the failure of calibration..... have you tried to calibrate it using the FADC Align & Control ? If it still fails then there is a question about the quality of the clock signal being received by this module. I will log through and look at the console log for any anomolies but please try and calibrate. Let me know if you wish me to take remote control.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown