AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 593     Entry time: Wed May 24 06:12:48 2017
Author: TD 
Subject: Lead bricks removed from BRIKEN aperture for source tests - AIDA NOT SHIELDED FROM BEAM 
To install the 252Cf fission source to test the 3He neutron counters, Pb bricks which
had blocked the BRIKEN aperture have now been removed.
ELOG V3.1.4-unknown