AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 12:28:00 2025
Author
*
:
Subject
*
:
> 10.20 DAQ continues OK > Current file May2017/R27_22 > > Detector biases; leakage currents OK - see attachment 1 > FEE64 Temperatures OK - see attachment 2 > good events; statistics OK - see attachment 3 > No warnings/errors reported by merger since DAQ GO - see attachment 4 > > *all* system wide checks OK *except* ADC calibration of nnaida1, 21 and nnaida1 clock status (=6) > > 10.30 E17/F11 ambient temperature +24.2 deg C, RH 39.7%, d.p. +9.7 deg C > Julabo FL11006 set point +20 deg C, actual +20.0 deg C, water level OK (c. 75%) > > Left DAQ running on alpha background calibration run > > ttyUSB7 log (nnaida1) attached > GUI got stuck while attempting to drag-and-drop ttyUSB7 to ELOG to upload. Terminal still working and > confirmed Merger working OK. > Killed nautilus process to get GUI unstuck. Uploaded ttyUS7 via Browse -> Upload button on ELOG instead. > > 15.51 DAQ continues OK > Current file May2017/R27_28 > > Detector biases; leakage currents OK - see attachment 6 > FEE64 Temperatures OK - see attachment 7 > good events; statistics OK - see attachment 8 > No warnings/errors reported by merger since DAQ GO - see attachment 9 > > *all* system wide checks OK *except* ADC calibration of nnaida1, 21 and nnaida1 clock status (=6) > > 15.53 E17/F11 ambient temperature +24.1 deg C, RH 40.1%, d.p. +9.8 deg C > Julabo FL11006 set point +20 deg C, actual +20.0 deg C, water level OK (c. 75%) > > Left DAQ running on alpha background calibration run > > ttyUSB7 log (nnaida1) attached > > 19.20 DAQ continues OK > Current file May2017/R27_31 > > Detector biases; leakage currents OK - see attachment 11 & 12 > FEE64 Temperatures OK - see attachment 13 > good events; statistics OK - see attachment 14 > No warnings/errors reported by merger since DAQ GO - see attachment 15 > > *all* system wide checks OK *except* ADC calibration of nnaida1, 21 and nnaida1 clock status (status=6) > > 19.30 E17/F11 ambient temperature +24.2 deg C, RH 38.5%, d.p. +9.2 deg C
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown